diff --git a/bg_charybdis/06rgb components.md b/bg_charybdis/06rgb_components.md similarity index 100% rename from bg_charybdis/06rgb components.md rename to bg_charybdis/06rgb_components.md diff --git a/bg_charybdis/09cables_to_splinky.md b/bg_charybdis/09cables_to_splinky.md index 2d566d9..2d93888 100644 --- a/bg_charybdis/09cables_to_splinky.md +++ b/bg_charybdis/09cables_to_splinky.md @@ -18,10 +18,9 @@ Be careful, because the Splinky shield assemblies are not reversible ! We will s # Left side -**For the following step, please prepare:** - ![](../assets/pics/guides/charybdis/44.jpg) +**For the following step, please prepare:** - Splinky shield assembly (left) - flexible plates assembly (left, with 5 keys on the thumb cluster) @@ -35,10 +34,9 @@ Install the cables coming out of the flexible PCB assembly into those connectors # Right side -**For the following step, please prepare:** - ![](../assets/pics/guides/charybdis/46.jpg) +**For the following step, please prepare:** - Splinky shield assembly (right) - flexible plates assembly (right, with 3 keys on the thumb cluster) diff --git a/bg_charybdis/10install_the_switches.md b/bg_charybdis/10install_the_switches.md new file mode 100644 index 0000000..b56ff8e --- /dev/null +++ b/bg_charybdis/10install_the_switches.md @@ -0,0 +1,18 @@ +--- +layout: default +title: Installing the switches +nav_order: 10 +parent: Build guides - Charybdis +--- + +# Table of contents + +1. TOC +{:toc} + +# Introduction + +Now that everything is connected together, the next step is to install the switches and the PCBs into the case. The process is exactly the same for both sides, so we will detail only the Scylla side (without trackball). + +{: .note } +You may have noticed that we still haven't done anything with the sensor PCB. This is normal, we will connect it after installing the switches. This is so that it doesn't get in the way when soldering the switches.