Skip to content

Latest commit

 

History

History
45 lines (32 loc) · 2.16 KB

README.md

File metadata and controls

45 lines (32 loc) · 2.16 KB

NucSIM

Simulate operations of Pressurised Water Reactor and attached Steam Turbine for Power Generation.

This simulation represents a rather basic model of a 3500MW(thermal) Pressurised Water Nuclear Reactor and associated Steam Turbine for power generation.

It is still very much a work in progress but currently can simulate operation of a PWR reactor from mode 5 condition (cold shut down) until mode 1 (power operations) and then up to full load. Some of the area/items already implemented include;

  • 4-loop PWR reactor
  • Pressuriser with heater and spray controllers
  • Reactor Source/Intermediate/Power range flux meters
  • Chemical and Volume Control system (CVCS) with borating/dilution control
  • Estimation of criticality
  • Effects of all components +/- of reactivity (although still working to get the negative reactivity effects of Iodine/Xenon accurate)
  • 4 x Steam Generators
  • Emergency Cooling Water system, with cold leg accumulator, LP/HP Emergency cooling pumps and containment spray pumps
  • Alarm/Event, Trip/SCRAM and Runback systems
  • simplified Condensate and Feedwater Systems
  • simplified Main Cooling Water, Service Water and Closed Cooling Water systems
  • simulation of various faults (Fallen rod, Ejected rod, Turbine trip, RCP trip and Runback, LOCA (Loss of Collant Accident)

Please find some current screenshots below.

Opening Screen view

Opening Screen view

Opening Screen view

Opening Screen view

Opening Screen view

Opening Screen view

Opening Screen view

The following is my to-do list;

  • complete operations manual
  • tidy up each screen and add trending where appropriate
  • standardise KKS plant coding for all equipment
  • improve Iodine/Xenon negative effect on reactivity modelling
  • add further faults that may be experienced into the simulation

I will upload some videos of simulator operation in the near future and hope to have this project finished before the end of 2024.