You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
1- In the week of Apr 12, Jim to check with Jeremy’s availability for an ad hoc meeting. Key topics are:
- Collaboration with PHUSE
- Patent topic
- People management reflection
- Having a liaison person between ISG and BRATS
- Do we need a subgroup working on launch readiness?
- think of launch the deliverables as if we are launching a product
- Use professional platform to reach out to end users/target groups (such as LinkedIn)
- Use general social media to reach out to the general public (such as YouTube channel)
- Synergy within working group
- Maybe collaboration with OCT is needed?
2- Postpone the full team meeting to the last week of Apr (proposing Apr 28 same time)
- Refresher training/walkthrough (of the charts that come from Rho’s Safety Explorer to the entire working group; then asking for volunteers to develop user-guide
- Subgroup updates
- Team building best slot survey (sometime in May)--- reminder to team members to prepare for the 2 facts and 2 lie, and 1-2 pictures that are important (and why/stories behind)
- Team membership confirmation (whoever does not sign up yet, please sign up)
- AOB
*Subgroup updates topics may include the following: AE volcano plot, QT subgroup, PHUSE collaboration, launch team This part is still under development, will be decided before the meeting
**AOB topics may include the following: Patent topic
Action items:
1- Mengchun to conduct the survey on best slot. Ideally it should be at least 1.5 hours
2- Team to have an ad hoc meeting (Jim to schedule) and finalize topics/agenda for full team meeting
3- Reschedule full team meeting to Apr 28 (Jim to reschedule)
4- Mengchun to work on the patent topic in parallel
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
-
Attendees:
@JimBuchanan @xni7 @mli1
Key notes:
1- In the week of Apr 12, Jim to check with Jeremy’s availability for an ad hoc meeting. Key topics are:
- Collaboration with PHUSE
- Patent topic
- People management reflection
- Having a liaison person between ISG and BRATS
- Do we need a subgroup working on launch readiness?
- think of launch the deliverables as if we are launching a product
- Use professional platform to reach out to end users/target groups (such as LinkedIn)
- Use general social media to reach out to the general public (such as YouTube channel)
- Synergy within working group
- Maybe collaboration with OCT is needed?
2- Postpone the full team meeting to the last week of Apr (proposing Apr 28 same time)
- Refresher training/walkthrough (of the charts that come from Rho’s Safety Explorer to the entire working group; then asking for volunteers to develop user-guide
- Subgroup updates
- Team building best slot survey (sometime in May)--- reminder to team members to prepare for the 2 facts and 2 lie, and 1-2 pictures that are important (and why/stories behind)
- Team membership confirmation (whoever does not sign up yet, please sign up)
- AOB
*Subgroup updates topics may include the following: AE volcano plot, QT subgroup, PHUSE collaboration, launch team This part is still under development, will be decided before the meeting
**AOB topics may include the following: Patent topic
Action items:
1- Mengchun to conduct the survey on best slot. Ideally it should be at least 1.5 hours
2- Team to have an ad hoc meeting (Jim to schedule) and finalize topics/agenda for full team meeting
3- Reschedule full team meeting to Apr 28 (Jim to reschedule)
4- Mengchun to work on the patent topic in parallel
Beta Was this translation helpful? Give feedback.
All reactions