Skip to content

Latest commit

 

History

History
96 lines (80 loc) · 5.21 KB

README.md

File metadata and controls

96 lines (80 loc) · 5.21 KB

webcl-hs-19

Web Clients HS 19

week 1

Note that todo items are not yet created: Todo View

week 2

  • Todos are converted to uppercase
  • Validation error (text red) occurs if todo text is shorter than three letters Todo View, Tests

week 3

  • Controller contains businesslogic (Todos are editable only until done)
  • The properties of attributes (like editable) are themselves observables
  • Projectors create the views and register listeners for both directions Todo View, Tests

week 4

  • Contains new application to manage persons in a master-/detailview
  • Specific person projectors and rich attributes prepared to be completed Todo View, Person View, Tests

week 5

  • Generalised projectors which can create the gui elements list and form
  • The projectors take a model and a list of attributes to display
  • Projectors can be reused for any model, automatically creating rich attributes, bindings, etc. Person View, Tests

week 6

  • CSS-in-JS: The Projector now also provides a css style for the defined classnames which when used has precedence over external css definitions
  • Dynamically added grid column for each passed attribute
  • More independence by checking whether there is a child to replace or the div should just be added
  • A focus animation on the inputfields in the style of material design Person View, Tests

week 7

  • A custom gauge object drawn on a canvas with JS binding mouse and touch interactions
  • Redrawing the sketch on changes to avoid pixelation
  • Canvas needs to use cursor position to determine values
  • Animated SVG-Image of eyes following the mouse pointer Gauge View, SVG Eyes View

week 8

week 9

  • Custom square element with programmable color, size and onclick-action and how it is used in html Custom element

week 10

Student submissions:

week 11

week 12

=> Week 6 Person View observable updated with listener limit to resolve memory leak Person View, Tests

week 13

week 14

  • Stable binding in PEP client with view-specific Presentation Models
  • Assignment-views of developers in projects are kept in sync as defined by the ModelWorld rule #1 Pep client

week 15