Feat/wormhole connect cutover #449
testnet.yml
on: pull_request
Build Testnet
/
Compute Branch Sha
0s
Build Testnet
/
Documentation
1m 15s
Build Testnet
/
Redirects
13s
Build Testnet
/
Advance Tools
1m 31s
Build Testnet
/
USDC Bridge
6m 22s
Build Testnet
/
Token Bridge
6m 24s
Deploy Testnet
0s
Annotations
5 errors
Build Testnet / Advance Tools
Process completed with exit code 1.
|
Build Testnet / USDC Bridge
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-usdc-bridge' exists
|
Build Testnet / USDC Bridge
The operation was canceled.
|
Build Testnet / Token Bridge
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-token-bridge' exists
|
Build Testnet / Token Bridge
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
build-docs
Expired
|
71.1 MB |
|
build-redirects
Expired
|
2.29 KB |
|