Skip to content

Feat/wormhole connect cutover #449

Feat/wormhole connect cutover

Feat/wormhole connect cutover #449

Triggered via pull request November 21, 2023 22:24
Status Failure
Total duration 6m 51s
Billable time 2m
Artifacts 2

testnet.yml

on: pull_request
Build Testnet  /  Compute Branch Sha
0s
Build Testnet / Compute Branch Sha
Build Testnet  /  Documentation
1m 15s
Build Testnet / Documentation
Build Testnet  /  Redirects
13s
Build Testnet / Redirects
Build Testnet  /  Advance Tools
1m 31s
Build Testnet / Advance Tools
Build Testnet  /  USDC Bridge
6m 22s
Build Testnet / USDC Bridge
Build Testnet  /  Token Bridge
6m 24s
Build Testnet / Token Bridge
Build Testnet  /  Publish
0s
Build Testnet / Publish
Deploy Testnet
0s
Deploy Testnet
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Build Testnet / Advance Tools
Process completed with exit code 1.
Build Testnet / USDC Bridge
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-usdc-bridge' exists
Build Testnet / USDC Bridge
The operation was canceled.
Build Testnet / Token Bridge
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-token-bridge' exists
Build Testnet / Token Bridge
The operation was canceled.

Artifacts

Produced during runtime
Name Size
build-docs Expired
71.1 MB
build-redirects Expired
2.29 KB