Notifications
You must be signed in to change notification settings - Fork 3
/
results.tex
242 lines (204 loc) · 9.89 KB
/
results.tex
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
\section{Results}
First, we confirmed that France does not have enough
\gls{LWR} \gls{UNF} to transition into a fully \gls{SFR}
fleet. As shown in figure \ref{fig:only_france}, France
cannot meet the \gls{ASTRID} fuel demand without receiving
\gls{LWR} \gls{UNF} from other \gls{EU} nations. France
is able to fuel some of its \glspl{ASTRID} and breed more
plutonium, but cannot meet the fuel demand of
all \glspl{ASTRID} with this aggressive deployment scheme.
\begin{figure}[htbp!]
\begin{center}
\includegraphics[scale=0.7]{./images/french-transition/france_only_compare.png}
\end{center}
\caption{\gls{ASTRID} fuel demand compared with fuel supply from only
France in the simulation. The lack of initial \gls{ASTRID} fuel
is caused by the lack of \gls{LWR} \gls{UNF} to reprocess. The
initial shortage then causes a decrease in plutonium bred by
\glspl{ASTRID} and thus a decrease in \gls{ASTRID} fuel supply.}
\label{fig:only_france}
\end{figure}
\subsection{Nuclear Material Inventory}
Table \ref{tab:sim_result1}
lists \gls{EU} material inventory in 2050.
The materials continue to accumulate after 2050, but the
\gls{UNF} France receives before 2050 is most impactful for the
feasibility of the transition. Note that table \ref{tab:sim_result1}
distinguishes the
\gls{UOX} in the simulation either stored or reprocessed to create \gls{MOX}.
\begin{table}[h]
\centering
\caption{\gls{EU} nuclear material inventory in 2050.}
\begin{tabularx}{\textwidth}{XrX}
\hline
\textbf{Category} & \textbf{Value} & Specifics \\
& \textbf{[MTHM]} & \\ \hline
UOX Loaded & 152,271 & UOX used in EU reactors 1970-2050\\
MOX Loaded & 6,463 & MOX used in French reactors 1970-2050\\
Available used UOX (EU) & 85,111 & Used EU (minus France)
UOX in storage for future ASTRID MOX
production\\
Available used UOX (France) &
12,582 & Used French UOX stored for
future ASTRID MOX production. \\
Reprocessed UOX (France) & 51,511 & Used French UOX already reprocessed for the production of LWR MOX \\
Tails & 1,330,165 & (Tails generated) $-$ (Tails used for production of LWR MOX) \\
Natural U Used & 1,482,436 & \\ \hline
\end{tabularx}
\label{tab:sim_result1}
\end {table}
\FloatBarrier
Figures \ref{fig:eu_tail} and \ref{fig:eu_snf} show the
accumulation of tails and used fuel over time in the \gls{EU}.
Tails accumulate as a by-product of uranium enrichment.
Spent fuel is discharged from reactors every refueling period.
The entire core is discharged when the reactor decommissions.
A total of $1,330,165$ MTHM of tails and $85,111$ MTHM of
\gls{UNF} have accumulated by 2050.
Figure \ref{fig:eu_fuel} shows the amount of fuel used in the \gls{EU}. The
tails mass accumulation rate is fairly steady, with peaks occurring when new
reactors are deployed.
In figure \ref{fig:eu_snf}, the peaks are caused by reactor decommissioning which
triggers all the batches in the final reactor core to be sent to the repository.
\begin{figure}[htbp!]
\begin{center}
\includegraphics[scale=0.7]{./images/eu_future/tails.png}
\end{center}
\caption{Simulated accumulation of tails in the \gls{EU} is shown as a function of time.}
\label{fig:eu_tail}
\end{figure}
\begin{figure}[htbp!]
\begin{center}
\includegraphics[scale=0.7]{./images/eu_future/total_fuel.png}
\end{center}
\caption{Simulated total \gls{EU} fuel usage is shown as a function of time.}
\label{fig:eu_fuel}
\end{figure}
\begin{figure}[htbp!]
\begin{center}
\includegraphics[scale=0.7]{./images/eu_future/snf_discharge.png}
\end{center}
\caption{Simulated \gls{EU} \gls{UNF} accumulation and discharge is
shown as a function of time. The large peak near 2025 is due to the planned German
nuclear phase-out, in which all German reactors will have been decommissioned by 2022.}
\label{fig:eu_snf}
\end{figure}
\subsection{French \gls{SFR} Deployment}
\FloatBarrier
Reprocessing the \gls{UNF} collected from all EU nations can provide
approximately 913 tons of plutonium. Table \ref{tab:pu} lists the
isotope, mass fraction, and quantity of plutonium that can be obtained from the
2050 \gls{UNF} inventory. With the \gls{SFR} breeding ratio above one, France
can transition into a fully \gls{SFR} fleet without extra construction of
\glspl{LWR}.
\begin{table}[h]
\centering
\caption{Plutonium in the \gls{UNF} inventory.}
\begin{tabular}{lrr}
\hline
\textbf{Isotope} & \textbf{Mass Fraction in Used Fuel [\%]} & \textbf{Quantity [t]} \\ \hline
Pu238 & 0.0111 & 9.76 \\
Pu239 & 0.518 & 506.05 \\
Pu240 & 0.232 & 226.64 \\
Pu241 & 0.126 & 123.09 \\
Pu242 & 0.0487 & 47.57 \\ \hline
\textbf{Total} & \textbf{0.9358} & \textbf{913.14} \\ \hline
\end{tabular}
\label{tab:pu}
\end{table}
From Varaine et al. \cite{varaine_pre-conceptual_2012}, a French
ASTRID-type 600\gls{MWe} \gls{SFR} consumes $1.125$ metric tons of
plutonium a year, with an initial plutonium loading of $4.9$ metric tons.
Used \gls{MOX} from an ASTRID reactor is 23.95\% plutonium
in this simulation (see table \ref{tab:comp_fresh}), whereas fresh \gls{MOX} is 22\% plutonium.
The plutonium breeding ratio in this simulation is thus assumed to be
$\approx 1.08$.
Figure \ref{fig:fuel} shows \gls{MOX} loaded in the \glspl{SFR} per month. The plot
has peaks during a period of aggressive deployment of \glspl{SFR} followed by
an equilibrium at 83 \gls{MTHM}. The peaks reoccur with the deployment of the
second generation of \glspl{SFR}. The spikes are due to initial fuel demand
corresponding to these new deployments. The initial cores loaded into new
\glspl{SFR} rely on the \gls{MOX} created from legacy \gls{UNF}. Once the
deployed \glspl{SFR} create enough extra plutonium, the legacy \gls{UNF} is no
longer used. Notably, this switch from a less preferred fuel origin to a more
preferred fuel origin is handled automatically within \Cyclus via user-defined preferences
within its dynamic resource exchange algorithm \cite{gidden_methodology_2016}.
\begin{figure}[htbp!]
\begin{center}
\includegraphics[width=1.0\textwidth]{./images/french-transition/where_fuel.png}
\end{center}
\caption{Fuel loaded into \glspl{SFR} was simulated in discrete
batches.}
\label{fig:fuel}
\end{figure}
Figure \ref{fig:avg_tot_rep} shows the average monthly reprocessing demand
and total reprocessing demand for each timestep. The average monthly reprocessing
demand grows steeply with the deployment of \glspl{ASTRID}, and later decreases
when \gls{LWR} \gls{UNF} is no longer reprocessed.
The average monthly reprocessing demand is calculated for each timestep $i$
with equation \eqref{eqn:avg_rep}. Timestep 600 is the year 2020, when reprocessing
begins for \gls{ASTRID} fuel.
\begin{equation}
\label{eqn:avg_rep}
\overline{\dot{m}}_i = \frac{\text{Total UNF reprocessed up until timestep i}}{\text{i - 600}}
\end{equation}
\begin{figure}[htbp!]
\begin{center}
\includegraphics[width=1.0\textwidth]{./images/french-transition/avg_tot_rep.png}
\end{center}
\caption{Average monthly reprocessing demand and total reprocessing demand are plotted
for each timestep.}
\label{fig:avg_tot_rep}
\end{figure}
Figure \ref{fig:pu_no_cum} shows the separated plutonium discharge per
month from the reprocessing plant. The plutonium outflux does not precisely
follow the fuel demand because \Cyclus agents have material buffers that
store commodity fuel for later usage.
\gls{UNF} is stored for the initial loading of \glspl{SFR}. Plutonium separated
from legacy \gls{UNF} meets plutonium demands sufficiently to reduce the
reprocessing demand for the first aggressive deployment of \glspl{SFR}.
The plutonium from reprocessing legacy fuel is a flat rectangle because the
reprocessing throughput was set to 183.2 $\frac{\gls{MTHM}}{month}$ to
avoid reprocessing all the legacy in one timestep.
\begin{figure}[htbp!]
\begin{center}
\includegraphics[scale=0.7]{./images/french-transition/pu.png}
\end{center}
\caption{The separated plutonium discharge from the reprocessing plant
in $\frac{\mbox{Tonne Pu}}{\mbox{month}}$. The plutonium from \gls{LWR} \gls{UNF}
is created after the demand is gone due to material buffers in \Cyclus.}
\label{fig:pu_no_cum}
\end{figure}
\begin{table}[h]
\centering
\caption {In the French transition to \glspl{SFR},
the total legacy \gls{UNF} reprocessed is the
amount of \gls{UNF} France needs
for a transition into a fully \gls{SFR} fleet.
}
\scalebox{0.86}{
\begin{tabular}{llr}
\hline
\textbf{Category} & \textbf{Unit} & \textbf{Value} \\ \hline
Total \gls{ASTRID} MOX used & MTHM & 62,144 \\
\textbf{Average UOX Reprocessing} & MTHM/month & \textbf{144.29} \\
\textbf{Average Total Reprocessing} & MTHM/month & \textbf{61.3} \\
\textbf{Average Fuel Fabrication} & MTHM/month & \textbf{36.9} \\
Total \glspl{SFR} Deployed & & 214 \\
Total Plutonium Reprocessed & MTHM & 13,671 \\
Total \gls{ASTRID} fuel from UOX Waste & MTHM & 3,001 \\
Total \gls{ASTRID} fuel from MOX Waste & MTHM & 59,143 \\
Total Tails used & MTHM & 48,472 \\
\textbf{Total legacy UNF reprocessed} & MTHM & \textbf{55,553} \\
Total Reprocessed Uranium Stockpile & MTHM & 194,186 \\
Total Raffinate & MTHM & 12,123 \\ \hline
\end{tabular}}
\label{tab:sfr_sim_result}
\end {table}
Table \ref{tab:sfr_sim_result} lists French reprocessing and
\gls{ASTRID} fuel fabrication metrics.
These results demonstrate that despite the large amount of initial plutonium that has to be reprocessed
prior to \gls{ASTRID} deployment, the 20 years (2020-2040) of
\gls{ASTRID} fuel preparation
allows a reasonable level of average
\gls{UOX} reprocessing capacity demand.