You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
We would like to have a concourse step trigger anytime spanning multiple days of week. I imagine that this is a use-case that has been addressed, but I can't figure out how to do it. I can successfully push a pipeline with the following definition, but I get a 'checking failed' error on the Schedule resource:
This should trigger as true every 10 minutes between Friday at 10pm and Saturday at 6am.
resources:
- name: schedule
type: time
source:
days:
- Friday:
start: 10:00 PM
stop: 11:59 PM
- Saturday:
start: 12:00 AM
stop: 06:00 AM
interval: 10m
location: America/New_York
The text was updated successfully, but these errors were encountered:
Assuming that you can't shift your timezone location so that it neatly lines up with your needs, you could you blend two different resources to trigger your job.
@alphaxr6 - it’s been a while since I cracked open this code. But on initial glance, I’m not seeing support for specifying the day of the month (just day of week and interval). So, I think the closest you could get would be to specify a 30-ish day interval.
We would like to have a concourse step trigger anytime spanning multiple days of week. I imagine that this is a use-case that has been addressed, but I can't figure out how to do it. I can successfully push a pipeline with the following definition, but I get a 'checking failed' error on the Schedule resource:
This should trigger as true every 10 minutes between Friday at 10pm and Saturday at 6am.
The text was updated successfully, but these errors were encountered: