Skip to content

revert: temp

revert: temp #759

Triggered via push November 19, 2024 09:53
Status Failure
Total duration 32m 49s
Artifacts

ci.yml

on: push
Matrix: integration-tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
integration-tests (3.11, master)
Process completed with exit code 1.
integration-tests (3.11, open-release/redwood.master)
The job was canceled because "_3_11_master" failed.
integration-tests (3.11, open-release/redwood.master)
The operation was canceled.
integration-tests (3.11, open-release/quince.master)
The job was canceled because "_3_11_master" failed.
integration-tests (3.11, open-release/quince.master)
The operation was canceled.