-
Notifications
You must be signed in to change notification settings - Fork 10
/
NSE_ARE_Design.txt
955 lines (640 loc) · 44.6 KB
/
NSE_ARE_Design.txt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
NUCLEAR SCIENCE AND ENGINEERING: 2, 804-825 (1957)
The Aircraft Reactor Experiment-Design and Construction®
E.S. BETTIS, R.W. SCHROEDER, G.A. CRISTY, H.W. SAVAGE, R.G. AFFEL, AND L.F. HEMPHILL
Oak Ridge National Laboratoryz, P.O. Box X, Oak Ridge, Tennessee
Received June 18, 1957
The Aircraft Reactor Experiment was designed for operation at temperatures in the region of
1500°F (1100 K) at a power of 1-3 MWt with a fluoride-salt fuel circulating in a heterogeneous
core. The moderator was hot-pressed BeO blocks cooled by circulating sodium. The heat
produced was dissipated in water through hot liquid-to-helium-to-water heat exchange systems.
All sodium and fuel circuit components were made of Inconel fabricated by inert-gas (Heliarc)
welding. The system was heated to design temperature by means of electrical heating units
applied over all parts of the system. Instrumentation and control of the experiment were fairly
conventional. For the most part, standard instruments were modified slightly for the high-
temperature application. The reactor system was constructed and operated in a building
specifically provided for the purpose.
The Aircraft Reactor Experiment (ARE) to be described in this paper was originally
conceived in a very different form from that in which it was ultimately constructed. In fact, the
original high-temperature reactor design did not employ a fluoride-salt fuel, and, in order to
understand some of the features incorporated in the ARE, a certain amount of historical
background 1s necessary.
By 1950, at various places in the country, work had progressed on the handling of high-
temperature sodium metal to the point that it was being seriously considered as a coolant for
nuclear reactors. Accordingly, a group of engineers and physicists at ORNL started design work
on a solid-fuel-pin sodium-cooled reactor, with the fuel consisting of *°U (as UO,) canned in
stainless steel. It was decided to make this a thermal reactor and to use BeO blocks as the
moderator. The circulating sodium was to extract heat from the fuel pins and at the same time to
remove heat from the moderator blocks. The design of this solid-fuel-pin, BeO-moderated,
sodium-cooled reactor proceeded to the point of purchase of the BeO moderator blocks. These
blocks, as fabricated for the original reactor design, are shown in Figure 1.
The solid-fuel-pin thermal reactor design was found to possess a serious difficulty when the
design concept was projected to cover a relatively high-power reactor. The problem was the
positive temperature coefficient of reactivity associated with the cross section of xenon at
clevated temperatures. This xenon instability was considered to be serious enough to warrant
abandoning the solid-fuel design concept, because of the exacting requirement placed on any
automatic control system by this instability.
An obvious way to avoid the control problem would be to incorporate a liquid fuel that
would have a large density change for a given change in temperature. If, upon heating and
expanding, a portion of the fuel could, in effect, be made to leave the critical lattice, a self-
stabilizing reactor would result.
! Presented by Mr. Cristy at the American Nuclear Society Meeting in Pittsburg June 10, 1957.
? Operated by the Union Carbide Nuclear Company for the US Atomic Energy Commission.
FIGURE 1: Stacked BeO Moderator Blocks.
A considerable amount of work had been done on molten fluoride salts for use in preparing
fuels in liquid form.” The fluorides did not moderate sufficiently well, however, to make a small
thermal homogeneous reactor with fluoride fuel (1). Since the liquid fuel carrier to be used as a
substitute for the solid fuel pins would not be required to be a moderator, it was decided to see
what could be done to incorporate the fluoride salts in the reactor under study. The fluoride salts
were attractive because their very low vapor pressures would permit reactor operation at
temperatures around 1500°F (1100 K) at nominal system pressures.
The first design incorporated stagnant fluoride-salt fuel, and it consisted of a cylindrical
moderator matrix, made up of the original beryllium oxide blocks, with vertical holes into which
small tubes of the fluoride fuel would be placed. The moderator and fuel tubing assembly would
be contained in a cylindrical pressure shell through which sodium would be pumped for cooling
the reactor. A number of poison rods would be inserted within the matrix for control and shim
> By ORNL Materials Chemistry and Metallurgy Divisions.
g
g
g}
HEAT EXCHANGER
£
5
[u]
|
X
g
£
REFLECTON Go0LANT
FIGURE 2: Schematic Drawing of Circulating-Fuel Reactor System.
purposes. At the top of the lattice, a slab of boron carbide would be placed, and the tops of the
fuel tubes would extend through this boron carbide "neutron curtain." The fuel tubes would not
be completely filled with liquid at design temperature and zero power, but the fuel level would
be above the boron carbide. Any expansion of the fuel occasioned by a rise in temperature
would expand more of the fuel to above the boron curtain to achieve fast inherent control or
stabilization of the reactor. This system of control effectively circumvented the solid-fuel
control problem.
A considerable amount of effort went into the design of this reactor, but in a relatively short
time the design was further modified because of some very difficult problems associated with the
stagnant liquid fuel. The primary difficulty, which necessitated a change in design, was the
prohibitively large radial thermal gradient within the molten fuel. Physical properties
measurements of the viscosity and thermal conductivity of the fuel indicated that, for reasonable
tube sizes, of the order of 0.080” (2.0 mm) inner-diameter, the center temperature of the fuel
would be several hundred degrees F above the wall temperature. In fact, in order to obtain
reasonable high-power outputs at reasonable coolant flows the center fuel temperature would be
dangerously near the boiling point of the fuel.
Another but entirely different problem associated with the stagnant-liquid-fuel reactor was
that difficulties would have arisen in loading the reactor at room temperature and having to
achieve criticality after it had been brought to the high design-point temperature. Such an
operation would have required large poison rods, and the heat cycling and draining of the coolant
between each fuel addition would have constituted an extremely laborious and hazardous
routine. Further, in heating from room temperature to operating temperature, the fuel would
change from a solid to a liquid, and, since the fluoride salts expand substantially in undergoing
this phase change, under certain circumstances a rupture of the fuel tube cold result. The fuel
loading problem would recur, of course, when it became necessary to add fuel for burnup and
poison compensation in a power reactor after long-time operation.
A solution to the thermal-gradient problem appeared to be circulation of the fuel with
turbulent flow to a heat exchanger so that the thermal conductivity of the fuel would not be relied
upon as the mechanism for removing heat from the fuel. Also access would be provided so that
the fuel loading could be done without disturbing the pressure shell. The only really new
problem was that of circulating the high-temperature fuel. Accordingly, the stagnant-fuel design
concept was abandoned, and work was begun on the design of a high-temperature circulating-
fuel reactor.
The ARE, as finally constructed, comprised the system indicated schematically in Figure 2.
The molten fuel was pumped through the 66 passages of the core, through finned-tube heat
exchangers, and back to the core in a closed loop. In the heat exchangers, helium extracted heat
from the fuel, and the helium, in turn, was cooled by forced circulation over a finned-tube heat
exchanger in which water was circulated. Heat generated within the BeO moderator and
reflector was transferred to molten sodium that was pumped through the interstices of the
moderator and the coolant passages of the reflector. The sodium, in turn, was cooled in a heat
exchange system analogous to that used for the fuel circuit.
OPERATING FACILITY
The ARE building was a steel-framework transite-sided mill-type structure. Offices and the
control room were located in a single-story portion of the building, underneath which was a
basement area that was used for auxiliary heating and cooling facilities, instrumentation, and an
emergency power source in the form of a bank of storage batteries. The reactor and its
associated equipment were installed in the crane-bay area of the building. This area was divided
into three concrete pits that extended to about 6 ft (2 m) below the basement floor level. The pits
were designed so that a thickness of 7.5 ft (2.3 m) of concrete, in the form of blocks, could be
placed over them to form a complete biological shield for radiation protection. All radioactive
portions of the experiment were installed within the three pits, as shown schematically in Figures
3,4, and 5.
The reactor pit was originally designed to contain only the solid-fuel reactor and to provide
for covering it with borated water for disassembly. During operation it would also have served
to isolate the high-energy neutron and gamma radiation and thus minimize radiation damage to
other equipment, such as the pump-lubrication systems. When adapted to the circulating-fuel
reactor the only items in the reactor pit were the reactor, a series of nuclear sensory instruments,
and two space coolers for removing the heat lost into the pit through the thermal insulation which
surrounded the reactor vessel and piping.
THE REACTOR
An elevation drawing of the reactor and the surrounding gas plenum chamber and thermal
insulation 1s shown in Figure 6, and the dimensions and volumes of the reactor vessel and its
contents at a mean temperature of 1300°F (980 K) are given in Table 1. The pressure shell was
composed of a 2-inch-thick (5 cm) Inconel sheet fabricated into a cylindrical shape with a
longitudinal Heliarc weld and with heads welded on by the Heliarc welding technique." The
pressure shell was designed to ensure that thermal stress would not exceed 3000 psi (20 MPa).
This required that the flat heads be reinforced to 4 in. (10 cm) at locations where they were
weakened by tube penetrations.
A plate of 1-inch-thick (2.5 cm) Inconel was spaced off the bottom of the pressure vessel by
eight 1-inch-diam (2.5 cm) studs which were fastened into the plate and rested unattached on the
inside bottom of the pressure shell. This plate had slots cut in it to allow the reverse bends of the
fuel tubes to protrude through it. There were also round holes to allow for passage of the fission
chamber and control rod thimble tubes through the pressure shell. The BeO-moderator blocks
* The welding procedures used were the result of thousands of hours of developmental work by the ORNL
Metallurgy Division.
5001UM CUTLET
PRESSURE SHELL
- THERMAL SHIELD
4
3
i
T
&
=
I
2
T
0
<
o
SAFETY CHAMBER NO. 2
MICROMICROAMMETER
HELIUM
RETENTION TANK
VIEWING PORT =
FUEL INLET
=9
N
-
it}
& ]
YW
SAFETY ROD~F
—LOG N METER
BFy CHAMBER AND
TEMPERATURE SERVQ MECHANISM
SAFETY CHAMBER NO. ¢
FIGURE 3: Isometric Drawing of Reactor in Pit.
., FRANGIBLE
i 'Y PISK VALVE U-3
\}-—ROTAMETER
. PRESSURE Y HEAT EXCHANGER NO.1
. TRANSMITTERS -,
VALVE U-62
R VALVE U-63
<
£
KEY:
. ' 10 CROSS BARS OM LINES INDICATE WELDS,
VALVE B-35 ALL FUEL PIPE LINES NUMBERED IN 100 SERIES,
VALVE 8-56
FIGURE 4: Isometric Drawing of Fuel System.
Noe VALVE U286~
U \VALYE u-z8—
a -
KEY: )
=3 CROSS BARS ON LINES INDICATE WELDS,
ALL SODIUM PIPE LINES NUMBERED IN
300 SERIES,
ODIUM FILL AND DUMP TANK NO.6
M FILL AND DUMP TANK NO.5 7 ir'™’
FIGURE 5: Isometric Drawing of Sodium System.
'REGULATING ROD
ASSEMBLY~._ J
: TUBE EXTENSION
SUibE S booE THERMAL SKIELD CAP
SAFETY ROO ASSEMBLY ] ; . THERMAL SHIELD TOP
8L \ e : _——FUEL INLET MANIFOLD
,_—P\ \ . . l ‘ N s % / . g
: % ok = :
- 7 ¢ . ; F 7 i
. . T;\,
THERMOCOUPLE 3 ' ! Py NS
LAYOUT : | &1 _7op HeapeR
-1 - 1k AR / 4
CORE ASSEMBLY : < Q\% ccdrcec | Uirpteric e e g % TOP TUBE SHEET
! 3 K B H y | e ';;r'“.'\l'\-
B A | N
¥ :i e l Y \%
‘\/ R % J ! \S N
REFLECTOR COOLANT |- §/4) / oA HeaTERS
TUBES AW : W,
3 fl-:\\‘_.\i i . Z : AN
A l 4 B BeO MODERATOR |
FUEL TUBES \; %%\_fi% ” g | XN X AND REFLECTOR
AN | .
AN THERMAL SHIELD w
v §é§ | ASSEMBLY &
PRESSURE SHELL ——1d ,;f\\ — || <
N o
Y\l : 5
O ;
A
NZN | :
NP | B
N7ZN i X OTTOM TUBE
§ /\ i ; SHEET
N . j
3 N l
WA ; STUD
N N | ] SUPPORT ASSEMBLY
BOTTOM HEADER YA i AT i
RN i ! — e g ) FUEL OUTLET
E/fi& i1 ! ! 1 , MANIFOLD
R :
N ,l.
X I I
N THERMAL SHIELD
THERMAL. SHIELD CAP N ; % BOTTOM
N N Il &
: <
| | N &
z | ) §
:- 'ii: \ l{g
]
SUPPORT ASSEMBLY HELIUM MANIFOLD i sn B .
SCALE N INCHES
FIGURE 6: Elevation Drawing of Reactor.
were stacked on this base plate after the serpentine fuel tubes had been placed inside the pressure
shell. The annealed serpentine bends used in making up the fuel system are shown in Figure 7.
The bent tubes were socket welded to form the eleven passes used in each of the six parallel fuel
paths in the core of the reactor. After the fuel tubes were placed in the reactor the split BeO
blocks were assembled around the tubes. The tops of the fuel tube bends and the stacked BeO
blocks are shown in Figure 8.
A thin sheet-metal cover was placed over the top of the blocks, with the reverse bends of the
fuel tubes extending through this top cover sheet. The top of the pressure vessel was then put in
place and welded to the cylindrical side-wall. The fuel tubes were welded to the pressure shell at
the inlet and outlet ends, but were free to expand within the holes of the moderator blocks.
The six fuel inlet tubes were connected outside the pressure shell to a toroidal header. The
fuel inlet system was connected to this toroidal header by means of a manifold which introduced
fuel at two points on the inlet distribution header. TABLE I
The reactor constituted an anchor point for the fuel DIMENSIONS AND VOLUMES AT A MEAN
and sodium piping of the system. Other anchor TEMPERATURE OF 1300°F (980 K)
points were the pumps and heat exchangers for the ‘
two systems. All piping stress was calculated as ~ Core height 90.93 cm
. . . Core diameter 84.60 cm
accurately as possible, and the piping was installed . :
) > Side reflector height 90.93 cm
in a pre-stressed condition so as to be unstressed at gjge reflector inside diameter 84.60 cm
design temperature. Side reflector outside diameter 122.0 cm
There were six sleeves which ran entirely Top reflector thickness 10.8 cm
through the reactor from top to bottom. These Lop reflector diameter 84.60 cm
o . Bottom reflector thickness 12.6 cm
sleeves were open at each end to permit circulation :
) X Bottom reflector diameter 84.60 cm
of hel-lum COOla-nt - and to prev;nt a possible pregure shell inside diameter 123.3 cm
collection of fuel inside the sleeves in the event of @ Pressure shell wall thickness 513 cm
rupture in the fuel system. The two sleeves which Pressure shell inside height 114.3 cm
ran through the reflector region of the core served Fressure shell head thickness 10.3 cm
. - - Fuel tube diameter (OD) 3.137 cm
as locations for fission chambers which were :
) i Fuel tube wall thickness 1.5 mm
inserted into them from the top. 'The other four Reactor vessel volume 132 m®
sleeves accommodated the three shim rods and the BeO in core 0412 m’
central regulating rod. BeO in reflector 0.500 m’ ,
The gas-tight can which enclosed the rod drives Fuel volume in core 0.0504 my
. . . Sodium volume in core 0.280 m
and fission chamber drives, which were o 3
) ) ) Inconel within the pressure shell 0.049 m
immediately above the reactor tank and outside the voume of control thimbles 0027 m’®
top shielding plugs, is shown in Figure 3. The
flexible bellows used to accommodate thermal expansion of the sleeves that penetrated the
reactor and comprised the rod and fission chamber gas cooling systems may also be seen in
Figure 3.
DESIGN CONSIDERATIONS
Detailed analyses of the requirements of the fuel-circulation system and fuel inventory
considerations indicated the use of more fuel tubes in the reactor, but the necessity for using the
existing BeO blocks required a design which used not more than 66 fuel tubes. Since the power
level of this reactor was to be in the 1-3 MWt range and since it was desirable to simulate the
temperature pattern of a high-power reactor, the fuel circulation rate was determined by the
temperature gradient to be obtained. Analyses of the thermal patterns that would exist in a single
fuel tube indicated that unless the fuel flowed turbulently, the wall temperature would become
dangerously high (2). This was a direct result of the low thermal conductivity of the fuel.
Therefore, to be sure that the Reynolds modulus was always kept above the transition region
(classically 2000 to 10,000), it was evident that the fuel would have to make several passes
through the reactor in series. A study of the pressure drop and Reynolds number characteristics
of various series methods was therefore made which indicated that the minimum flow
requirements could be met without excessive pressure drop by providing six parallel systems of
11 tubes each. This arrangement provided for a minimum Reynolds modulus of 14,000 and gave
a measure of safety against slight inequalities of flow between parallel passages. Experimental
results from a full-scale water and glass model indicated that full turbulence would be
maintained within the reactor core with flow which produced a Reynolds modulus of 5000.
FIGURE 7. Bent tubes ready for installation in reactor vessel.
A very serious defect in this design was that the fuel system of the reactor was non-drainable.
In view of the fact that the moderator blocks would allow no other fuel configuration, it was
decided to accept the problems associated with a non-drainable fuel system. This resulted in the
employment of rather drastic safety features in the system, and the operation of the reactor was
accomplished by exercising extreme care in every phase. The non-drainable feature prohibited
the repair of a known gas leak and made necessary the use of awkward methods for disposing of
fission fragment escape from this leak when power operation of the system was attained.
Since the ARE was deigned to operate in the range between 1000-1500°F (810-1100 K),
means had to be provided for supplying heat to the system prior to the generation of heat within
the system by the fission process. The melting point of the fluoride carrier used as a vehicle for
the uranium fuel was near 950°F (780 K), and it was therefore necessary to be able to heat the
system to a temperature of at least 950°F. Also, some heat had to be applied at the pressure shell
so that the reactor could be brought to a temperature well above the melting point of sodium. In
order to provide the required heating, 48 Inconel-clad strip heaters of 1500-W capacity each
were clamped around the cylindrical wall of the pressure shell in a vertical arrangement, as
shown in Figure 9. The maximum power input to these heaters was about 45 kW.
FIGURE 8: Reactor Core (top view).
In order to ensure an even distribution of temperature along the fuel-distribution lines, these
lines, as well as all major components of the system, were double-walled to provide an annular
gas space 1n which helium was circulated. Electric resistance heaters were placed on the outer
surfaces of the double walls. The flowing gas in the annular space was also a precaution against
a freezeup which might result if a heater should burn out on any portion of the fuel circuit.
Shim rods, which consisted of segmented boron carbide slugs canned in stainless steel and
mounted on a small stainless steel rod, were used for shim control and safety of the reactor.
Enough poison had to be included in these rods to provide for runming the reactor subcritical at
room temperature, since the system was non-drainable. Such a precaution was also essential to
ensure ability to disassemble the reactor in the event it was impossible to flush the fuel out of the
core at the end of the expeniment. The shim rods were in the shape of cylinders 1 inch long with
Y4 inch wall thickness. A hole in the center provided space for the mounting rod with sufficient
clearance for gas cooling to prevent overheating when the reactor was operating at power.
CONTROL SYSTEM
As stated above, the drives for the shim rods were located in the gas-tight housing directly
above the reactor (Figure 3). A reversible AC motor drove a lead screw for each shim rod. An
electromagnet was moved up and down by this lead screw in a piston-type housing. The
armature of the electromagnet was fastened to the long stainless steel rod to which was attached
the shim rod hanging in the reactor. When the electromagnet was de-energized the rods fell into
FIGURE 9: Reactor vessel during installation of strip heaters.
the reactor. During the last 6 in. of its travel, the armature compressed gas in the cylinder and
thereby formed a pneumatic shock absorber for the rod.
The rods were made up of short segments in order to provide flexibility, so that even if the
shim rod thimble became distorted in the lattice the rod would conform and fall into place. At
the very center of the reactor, a 1-in.-diam stainless steel rod mesas inserted in the control rod
thimble hole for vernier control of the reactor. This rod was driven by an on-off type of
reversible servomotor, which could be actuated manually from the control console or could be
actuated by a signal from the micro-micro-ammeter.
In the pit with the reactor there was a lead-shielded slab which contained five horizontal
instrument tubes (see Figure 3). There were two boron-coated ionization chambers, a BF3-filled
proportional counter chamber, a log N compensated ionization chamber, and a chamber for
operating the micro-micro-ammeter which, in turn, operated the servo control. These neutron
sensors could be moved in and out of the shielded housings to provide control signals as the level
of activity of the reactor was changed.
HEAT EXCHANGE SYSTEMS
The fission generated heat from the reactor was removed by pumping the hot fuel through a
finned-tube heat exchanger where the heat was picked up by helium, which, in turn, was
circulated by means of a large centrifugal blower in a closed loop. Inside the helium duct was a
finned-tube heat exchanger through which plant water flowed from the water main to a sewer.
Actually the fuel heat exchanger and the water heat exchanger were each divided into two units
with the liquid sides being connected in parallel. One fuel heat exchanger was mounted adjacent
to a water heat exchanger with a 4-in. space between. This space accommodated a vertically-
operating heat barrier door which could be lowered by means of an actuator motor to reduce heat
loss while bringing the system to temperature or raised into a covered recess for power operation
of the system. The other pair of heat exchangers was located in a similar manner, and the pairs
were connected by a sheet steel duct that enclosed the helium blower.
The fuel heat exchangers consisted of 1-in.-o0.d. Inconel tubing with spiral stainless steel fins
2 in. in diameter on the outside. The tubes were not finned at the bends so that each 27-ft length
of tubing could be bent into nine passes approximately 3 ft long. Six of these tubes were welded
into headers at each end, and the headers were baffled so that the flow was through three pipes in
parallel. The fluid traveled a total distance of approximately 54 ft while in the heat exchanger.
At a flow rate of 20 gpm through each heat exchanger, the pressure drop was 22 psi. For a
fuel inlet temperature of 1522°F (1100 K) and an outlet temperature of 1209°F (927 K), the
helium gas temperatures at a flow rate of 12,300 cfm (5.80 m’/s) (hot) were 180°F (355 K) at the
inlet and 620°F (600 K) at the outlet. In the water heat exchanger, which cooled the helium, the
water temperature increased from 70 to 135°F (295 - 330 K).
An operating fuel pump, together with a standby fuel pump, was mounted above the heat
exchanger assembly. These pumps were sump-type centrifugal pumps with gas seals and
overhung bearings. The sump tank served a dual capacity as an expansion tank for the fuel. A
helium pressure of 5 psi was maintained over the fuel in the sump tank. The standby pump was
isolated from the fuel system by a frangible disk valve on both the inlet and discharge lines of the
pump. Two more air-actuated bellows-seal valves were used to isolate the fuel system from the
fill tanks. The layout of the fuel system is shown schematically in Figure 4, which does not
show the water heat exchangers or the duct work enclosing the helium circuit.
The smallest pipes in the fuel system were the 1-in.-diam inlet and outlet lines to the heat
exchangers. As may be seen in Figure 4, these lines had two or more right-angle bends in them
to provide for thermal expansion, since both the pumps and the heat exchangers were solidly
anchored. Line 115 had the highest stress of any in the fuel piping. It was prestressed cold to
38,000 psi and the computed hot stress was 19,600 psi. The main fuel lines from and into the
reactor were 2-in.-diam lines.
The entire piping system of both the fuel and sodium circuits vas enclosed by stainless steel
tubing which formed an annulus spaced 1 in. from the outside wall of the primary pipe. Through
this annulus helium was circulated by means of two positive-displacement pumps. This gas
system communicated with and became a part of the rod cooling system for the reactor. As
stated above, it also served to equalize any thermal differences created along the lines by too
much or too little heat input from the electrical heating. In addition, copper gauze placed at
sample points in this gas stream was removed for periodic tests in a phenolphthalein solution in
order to monitor sodium or fuel leaks in the primary circuits. Temperature monitoring was
obtained with Chromel-Alumel thermocouples that were welded to the outside of all fuel and
sodium lines at a minimum of 3-ft intervals. These thermocouples were connected to recording
or indicating instruments.
The sodium cooling circuit is shown schematically in Figure 5. In this system, two
independent circuits were operated. This duality was, in the interest of safety, an effort to ensure
some cooling of the system in the event of a single pump failure. Even if the fuel pump failed,
sufficient heat transfer was available to remove the after-heat from the reactor by means of the
sodium circuit, since the sodium was in contact with the fuel tubes.
The sodium and fuel lines, as stated above, were heated electrically with heaters in the form
of ceramic half-cylinders that were installed around the annular piping. Over the heater units
was a 4-in.-thick layer of thermal insulation. Thus a 2-in.-diam line with the annulus, heater, and
insulation attained a diameter of about 14 in.
The heat exchanger pits included, in addition to the fuel loop, the sodium loop, the rod
cooling and monitor-annulus blowers, and equipment for handling radioactive off-gases. This
off-gas system, which consisted of compressors, holdup tanks, sodium filters, and a considerable
array of gas lines and valves, was never used because of a leak in the gas closure of the fuel
pump. When the fission gases were found to have leaked into the pits, which were not
completely gastight, it became necessary to extemporize a gas pumping system by using
compressed air jet pumps to pull a slightly negative pressure (6-10 in. H;O) on the pits and to
discharge the gas through a temporary 2-in. pipeline some 1000 ft away from the building.
FILL AND DUMP TANKS
The diagrams of the fuel and sodium systems, presented above (Figures 4 and 5) show the
general arrangement of the sodium flush-and-fill tanks, the fuel fill tanks, and the hot-fuel dump
tank in the dump-tank pit. Three Inconel tanks of 14.5-ft’ capacity were used to contain the
sodium prior to filling and subsequent to dumping from the circuit. These tanks communicated
with the basement arca through the pit wall by heated lines so that the hot sodium could be
pumped into the vented tanks when the system was nearing the operational phase. Two similar
tanks provided for the storage of the fluoride carrier prior to operation of the system.
All these tanks were suspended, slightly above the floor, on rods anchored in steel beams
near the top of the dump-tank pit. This suspension permitted the tanks to move in any direction
in the horizontal plane as the piping systems connected to them expanded upon being heated.
All the tanks were covered with Calrod electric heating units and then msulated with 4 in. of
thermal insulation.
The other tank located in the pit was the hot-fuel dump tank, which was of different design.
It was installed to collect the fuel after the experiment had been run. The intense radioactivity of
the fuel after having been used for operation at a power level of 2 MW for appreciable periods of
time produced sufficient heat to make cooling mandatory, and if the fuel were to be maintained
molten after the radioactivity had decayed it was also necessary to supply heat to the tank.
Accordingly, this hot-fuel dump tank was designed for cooling of the fuel by gas convection and
for shutting off the circulation of gas and adding heat when desired.
The hot-fuel dump tank was constructed like a small fire-tube boiler. The cylindrical tank
had an inside diameter of 40 in. and was 36 in. high. Running through the tank from top to
bottom were 91 sched-40 2-in.-diam pipes, or flues, for gas cooling. The tank had a capacity of
approximately 19 ft’, and therefore could hold more than two volumes of the fuel circuit.
Mounted above the tank was a sheet-metal chimney to accentuate the flow of pit gases through
the coolant flues in order to prevent overheating of the fuel. The 91 flues were disposed
symmetrically in the dump tank so that the maximum distance through which heat had to flow
before contacting a coolant tube wall was about 2 in. A damper was located in the top of the
chimney or stack so that the flow of gas could be essentially stopped when it became necessary
to add heat for maintaining the fuel in the molten condition.
All the dump tanks were equipped with heated gas-vent lines in which were located
pneumatically operated valves. Helium pressurizing lines also ran to each tank, and these lines
were controlled by pneumatically or solenoid operated valves. All tanks contained dip lines so
that the liquid could be transferred from the tanks to the system by pressurizing the tank with
helium. Specially designed and fabricated high-temperature valves were installed in the liquid
line to each tank.
Pre-installation tests of valves of the type to be used in the ARE indicated that some valves
were leaktight while others were not. Unfortunately no way of improving the valves was evident
and time did not permit a new valve development program. Since it was also impractical to
check at high temperatures every valve intended for use in the system, a decision was made to
use the valves as received and, in case they leaked, to pressurize the fill tanks with inert gas and
thereby operate the systems with an overriding back pressure below the valve. All the liquid line
valves were spring-loaded in one direction with pneumatic actuators working against the spring.
In every case the spring was used for the “safe” operating direction of the valve.
All pneumatic instruments were operated with dry helium, since the instrument gas bleeds
might be radioactive. Also an effort was made to enrich the pit atmosphere with helium as much
as possible in order to minimize the chance of fire in the event of a sodium leak. Further, the
closed helium loops on the fuel and sodium heat exchange system were not completely gastight.
The helium consumption rate for the experiment was therefore phenomenally high, but since the
experiment was of very short duration this extravagant helium usage was acceptable. The
helium for the experiment was furnished from tank trailers which were filled from railroad tank
cars. All the helium was passed through a NaK scrubber to remove traces of oxygen and water
vapor.
THE CONTROL ROOM
Control of the ARE, from the very beginning, was considered to be an integral part of the
design. In fact, control engineers were active in the original planning of the system. The
instrumentation and control of the experiment became quite involved and, in many cases,
somewhat awkward, but the question of whether or not the system was adequately under control
never was considered to be in doubt.
The parameters with which control was primarily concerned were neutron flux, or fission
rate, and temperature. Secondarily, such important quantities as liquid level, liquid flow,
pressure, and pump speed had to be measured and controlled as accurately as possible.
The mean reactor temperature was determined by controlling the amount of uranium added
to the system and by the positioning of poison rods within the active lattice of the reactor. The
computed critical mass and the preliminary critical experiments associated with the experiment
are discussed in the following paper (3), as is the batch method of adding uranium to bring the
reactor to criticality (4). A brief description of the control and instrumentation hardware is given
here.
The neutrons were measured by two fairly conventional (except for certain high-temperature
modifications) fission chambers located in thimbles placed in the reactor reflector. These
chambers could be lowered or raised in the core by means of reversible motors, the control of
which was effected from the control console by means of switches. Also a BF; counter and
compensated ionization chamber located in shielded thimbles in the reactor pit were used for
neutron sensing at higher power levels. Indication of count rate and fission rate level was given
by recording instruments mounted directly in front of the console of the instrument board.
Synchro indicators on the console showed the positions of the fission chambers and all the
control rods. Positioning of the control rods was also effected by reversible motors, which were
operated by means of switches on the console. The usual travel-limit lights were mounted on the
console, along with the respective control switches and synchro indicators.
The ionization chambers used for fission-rate safety controls were connected to the electronic
system which provided energizing current for the magnets which held the shim rods. Also an
instrument (the pile period recorder) which produced a signal proportional to the rate of change
of the fission rate was incorporated in the safety scram circuit. Thus the reactor was shut down
by the dropping of all safety rods if the fission rate became excessive or if the positive rate of
change of the fission rate became too large. As may be seen, the nuclear instrumentation and
control of the ARE were quite orthodox and no different from those of other reactors in this
country.
Operation of the system at temperatures near the upper limit permitted by the structural
material made it imperative that temperatures be measured as accurately as possible at all points
where hot spots might occur. Therefore recording temperature instruments were used for the
more critical points in the system. The recorders for these points were located directly in front of
the operating console on the instrument board. Reactor inlet and outlet temperatures and the
temperature differences across the reactor were displayed on recorders located adjacent to the
nuclear instruments. Temperatures of decreasing importance were displayed at more remote
points on the instrument panel. Thermocouples attached to most points along pipe lines of both
the fuel and sodium circuits were connected to temperature-indicating instruments located in the
basement control area.
The liquid levels in the sumps of the sodium and fuel pumps were indicated by floats and by
electrical conductivity probes that extended through the top of the sump tank. Signals from the
floats were picked up inductively through inverted Inconel wells above the sump tank tops. The
levels had to be controlled to prevent flooding of the pump seals and loss of prime. The free
liquid surfaces in the sump tanks constituted the highest points in both the sodium and fuel
circuits. Changes in liquid level could be caused by temperature changes in the liquid or by a
shutoff valve leaking fluid from the system into a fill tank. In operation no difficulty was
experienced with level changes in the fuel circuit, but leaky valves in the sodium circuit made
frequent adjustments necessary.
Pressures in the system were measured by differential pressure transmitters located at
strategic points in the liquid systems. The fluid pressure exerted on a bellows was balanced with
a helium pressure by a null-balance principle, and the balancing helium pressure was indicated
on pressure gauges located on the mstrument panels.
On the various pumps, tachometer generators provided electrical signals which were
calibrated in rpm, and these were indicated on the instrument panels. Acoustical vibration
pickup units were mounted on all rotating elements. Signals from these units were amplified and
converted into sound which was audible from a speaker in the control room and provided a
qualitative check of pump operation. A switch allowed manual selection of any one of these
signals for monitoring.
The speed of each pump was calibrated against flow when pumping water during the
shakedown runs. The sodium circuit also had electromagnetic flowmeters which produced an
electrical signal calibrated in gpm of sodium flow. The flow in the fuel system was measured by
a specially designed high-temperature rotameter which used the same type of induction sensing
as that used in the liquid level devices for the pump tanks.
In general, the process instrumentation of the ARE was adequate, but there were numerous
weak points in the system. The main problem lay in adapting existing sensors to high-
temperature application. Very real advances have been made in instrumentation development
since completion of the ARE, and instruments now available are far superior to those used in this
experiment.
AUXILIARY EQUIPMENT
The basement area was used primarily for the distribution and control of the electrical-
heating equipment provided for bringing the experimental system up to the operating
temperature. The power for the building was supplied by a three-phase bank of three 250-kVA
transformers from a 13.8-kV line and was stepped down to 460 V. The power was fed to two
breakers. The 120/208-V service was transformed in the basement of the building from the 460-
V lines. A 75-kVA emergency diesel-powered generator set, which produced 120-208 V. was
connected so as to pull part of the load in case of a purchased-power failure. Storage batteries
were also floated on the DC line for use in case of a line failure. Direct current was supplied by
a motor-generator set, which was controlled so as to produce the required current and to keep the
batteries charged. A DC-AC generator set produced alternating current for the instruments. The
building had an emergency lighting system which ran off of the batteries. With only the
instruments, heating, lighting, and compressed air systems operating, the building load was
approximately 200 amperes at 460 V.
The largest use of power in the experiment was for process heating, which, as stated above,
was required to bring the systems to the temperature required for filling with molten fluorides
and with sodium and to make up for heat losses. The various types of heaters used included strip
heaters, tubular heaters, flat-molded heaters, semicylindrical molded heaters, wrapped resistance
units, and resistant sections. The strip units were used on the low-temperature tanks. The
tubular units were used on the pressure shell, high-temperature tanks, off-gas lines, and many of
the small lines, as well as some valves and odd-shaped units. Most of the strip and tubular
heaters were 230-V units. The semicylindrical molded units were used on the fuel and sodium
lines, valves, and some of the small tanks. The flat molded units were used on the pumps, some
of the tanks, and the elbows of some of the pipes. The wrapped resistance units were used on
some of the small lines which were to run at low temperature with a low power demand. The
resistant heating sections were used on special pipes that required high heat for short periods of
time or that could not be reached by the other types of heaters. The molded units were 120 V,
with half-units of 60 V. The wrapped resistance units were cut for 230-V service.
All the heating units were mounted as close as possible to the unit to be heated. For example,
straps or bands were placed around tanks and the heaters were bound into place to produce the
best possible conditions for heat transfer. In most cases, metal sheets were placed around the
heaters to separate the insulation from the heaters. Stainless steel wire was welded to the
terminals of the heating units, and beads were placed on the wires to reach through the insulation
where they were in turn welded to copper wires with heat-resistant insulation. These installation
procedures were carried out for all types of heaters used. In most cases, the heating units were
connected, three units in a series, to a leg. In the case of a closed delta, there were three units in
each leg or a total of nine units. The open delta had six units.
The maximum voltage that could be applied to a single 120-V unit was 115 V and, to a single
230-V unit, 208 V. On the closed or open delta units of the 230-V class, which had three units in
series, each leg was rated 690 V, but the maximum applied was 600 V. On the units of the 120-
V class, which were rated 360 V, the maximum applied was 300 V. These limits of voltage
provided a safety factor against burnouts. During the final run burnouts occurred on only three
deltas.
The power to the heating units was controlled either by Powerstats or voltage regulators.
There were five automatic controls used in the system, and these were backed up by Powerstats
in order to provide control over the longest heating range possible.
In addition to the electrical distribution and control system, the basement contained the water
distribution system which provided the entire heat sink for the experiment. From the basement
area the water flow to all portions of the heat disposal system could be measured and controlled.
Since the expected life of the experiment was only of the order of 100 hr, no effort was made to
conserve water. The water distribution system was designed to ensure adequate cooling at all
times. A vertical cylindrical tank served as a reserve supply in case of temporary loss of water
from the main. This tank was of sufficient size to permit operation of the facility for
approximately 1 hr in the event of a water main failure.
SUMMARY OF CONSTRUCTION EXPERIENCE
By far the most crucial part of the construction of the ARE was the welding. The entire
system was made of Inconel, and all joints and closures were effected by Heliarc welding to
assure high-quality welds. The helium used during the welding was required to have a dew point
of -40°F. Joint preparation prior to welding was meticulously controlled, and weld setups were
inspected before the welders were allowed to begin the fusion. Dye penetrant, as well as gamma
graphing, was used in the inspection of every weld. When there was any detectable defect, the
weld was cut out and remade. The integrity of the experimental system can be attributed to the
thoroughness of the welding techniques worked out before the construction was started and to
the conscientious adherence to these techniques on the part of the installation field forces.
The heating of the equipment in a completely uniform manner also constituted a major
problem. The original articulation of the heater control was increased several-fold before it
became satisfactory. It has been found that when all parts of a system containing molten
fluorides are heated to well above 1200°F, no trouble is encountered in handling the melt by inert
gas pressure above the liquid surface.
REFERENCES
R.C. BRIANT AND ALVIN M. WEINBERG, Nuclear Science and Engineering 2,797 (1957).
. H.F. POPPENDIEK AND L.D. PALMER, Chem. Eng. Progr. Symposium Ser. 50, No. 11, 93
(1954).
3. W.K. ERGEN, A.D. CALLIHAN, C.B. MILLS, AND DUNLAP SCOTT, Nuclear Science and
Engineering 2, 826 (1957).
4. E.S. BETTIS, W.B. COTTRELL, E.R. MANN, J.L. MEEM, AND G.D. WHITMAN, Nuclear
Science and Engineering 2, 841 (1957).
b =