-
Notifications
You must be signed in to change notification settings - Fork 10
/
ORNL-CF-61-12-50.txt
1546 lines (848 loc) · 20.7 KB
/
ORNL-CF-61-12-50.txt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
UCN-2383
(3 11-80)
OAK RIDGE NATIONAL LABORATORY
Operated by
UNION CARBIDE NUCLEAR COMPANY
Division of Union Carbide Corporation
Post c? Box X CENTRAL FILES NUMBER
Oak Ridge, Tennessee _
DATE: December 26, 1961 COPY NO. éii/
SUBJECT: MSRE -~ Analog Computer Simulation of the
System With a Servo Controller
TO: G’O Ao CI'iS-ty
FROM: 0. W. Burke
ABSTRACT
One purpose of this study was to determine whether the fuel salt
-~ temperature inside the reactor could be controlled with a closed-
loop servo controller. An "on-off" type controller was demonstrated
using four different control signals. The stability of the system
/ when using the controller was of primary interest.
These studies indicated that the system was stable for large and
relatively fast power demand changes when using the controller with
any one of the four control signals.
NOTICE
This document contains information of a preliminary nature
and was prepared primarily for internal use at the Oak Ridge
- National Laboratory. It is subject to revision or correction
. and therefore does not represent a final report. The information
N is not to be abstracted, reprinted or otherwise given public
dissemination without the approval of the ORNL patent branch,
Legal and Information Control Department.
CONTENTS
I. Introductionecseccococecosceoceecoososocococasso
IT. Description of the System Simulated secoceecoecse
IIT. Description of Controllerecececcoccccccocccocsoss
V. Description of the Control Signals Used cecoo
A. Control Signal No. 1, €, ccccccecooocssos
B. Control Signal No. 2, €
C. Control Signal No. 3,62 coeecccecccsoss
€,
® 0 06 60 © 060 0 0 06 © 06 0 O 0 o
D. Control Signal No. L
Vo Procedure and Res-tfl.ts’0.000000000000000000000
© © 0 0 ¢ 6 0 6 0 0 0 0 0 00
l. Basic Flow Diagram of MSRE System ococeoceee
2. Identification of Temperature Symbols....
3. MSRE Design Point Data_as of 12-13-60....
L. Generator Circuit for &/ ...ccccccoccsccs
5. Generator Circuilt for'f; ccoeescccocococe
6. Generator Circuit fOr€, eeceeccecoccccs
7. Generator Circuit forEL_ cocoeccoscoccee
8. Control Signal €, , Nuclear Power and
Mean PFuel Temperature in Reactor vs.
TiME cococooeocecccocscesossscooscoococcoonocosocos
9. Control Signal é&,, Nuclear Power and
Mean Fuel Temperature in Reactor vs.
TIiME ceeceococcsocsessosscoscoscooocsocoooccss
10. Control Signal 6; , Nuclear Power and
Mean Fuel Temperature in Reactor vs.
Time © 0 0 © O © O @ ©6 & & 06 ¢ 0 6 © ¢ 0 6 06 & 06 0 00 0 O © 0 0 00 © 0 0O 0
11. Control Signal 6;, Nuclear Power
andT VSo Timeooooooooooooooooooooooo
OI"
BibliOgraphy ©6 000006006 0©00O0O0O0O0CS6 066 060O0OCO0COOCO0O0OS O00O0COCO0 OO0
Distributign e 06 6 6 6 0 0O 8 0 0O © 6 06 ©0 @ © & 0 © 6 0 0 @ 0 06 06 060 06 0 6 ©0 0 0 ©0 © ¢ 0 o
O\
I
—~J
9-10
11-12
13
14
15
16
17
18
19
20
22-23
IT.
III ©
Introduction: It is desirable to provide a controlier for con-
trolling the fuel temperature inside the reactor. There are many
control conceptg that would do the job.
The decision was made to try a simple "on-off" controller. E. R.
Mann of the Instrumentation and Controls Division proposed four
control signals which have definite possibilities and suggested
that they be demonstrated on the analog computer. This report
covers the analog computer demonstrations.
Description of the System Simulated: A schematic flow sheet of the
MSRE system is shown in Figure 1., The temperature symbols are identi-
fied in Figure 2. The design information used in these studies is listed
in Figure 3. The analog computer diagram is filed in the Engineering and
Mechanical Division print files on Drawings 40331 and L0332,
The simulation of the thermal system and nuclear system as used in these
studies has been discussed in previous preliminary reports.~ There were
two changes, however, that were significant. The temperature coefficient
of reactivity of the graphite was changed from:
2x10% 6k to -6x10° Sk
K-OF K-°F
and the total secondary salt looP transit time was changed from 13
seconds to 24.2 seconds.
Description of Controller: The controller simulated was a simple
"on-off" servo controller. The rod drive motor was a constant speed
motor, driving the rods at a constant velocity sufficient to change
the reactivity at a rate of:
0002 O K
K-sec.
For the sake of simplicity, the rod worth was considered to be linear
throughout the range used in these studies. The "time constant” of the
controller was assumed to be 50 milliseconds. This "time constant" is the
time required for the rod speed to attain 63% of full speed subsequent to
receiving a demand signal to move the rods. The "dead band" of the con-
troller was I 20F,
Description of the Control Signals Jsed: The four different control
signals used with the above described controller were as follows:
A. Control Signal No. 1,€&,
The egquation expressing éi is as follows:
IR e 4 )
where,
G = control signal gain factor or amplification factor.
m, n, and a are coastants that may be varied at will.
@ = neutron flux
To = Fuel salt temperature at the reactor outlet.
T
T;] = TFuel salt temperature at the inlet to the reactor.
r t
g(t) = )\.J[acb - (To:l - ‘I’J - g (t)] dt
r r
0 - L.
This can be considered as a'"rese% mechanism." t:_yfifxffflwfivfi
Tsp - The desired mean fuel temperature in the reactor.
The controlled variable in E} is the mean fuel temperature in the
reactor, Té] + TQJ » This variable appears only in the
r T
2
second term of the contrcl signal. If this term alone is used as
the control signal, the system 1s unstable.
The first terflliILGV can be considered as a high frequency band
pass stabilizing mechanism. It merely compares the rate of pro-
duction of nuclear power to the rate of addition of heat to the
fuel salt as it passes through the reactor. Note that for steady
state operation:
ddgg(t)}O =A.2[a 9 _(TOL- Tj]r>- g(t)] o
g (t)=2a ¢ - <§é]r - Ti}é)
This insures that the first term:flnf) will be zero for steady state
operation whether the term:
b (- o)
is zero or not. For this reason, the constant, "a'", does not have
to be reset for various power levels. thf) exceeds the dead band
_)_J__J
positively, rods will be inserted and iféi exceeds the dead band
negatively, rods will be withdrawn. The analog computer diagram
used to obtain 6} is shown in Figure L.
The temperature sensing elements are thermocouples attached tc the
walls of the pipes containing the fluids whose temperatures are to
be measured. There is a time lag between the time at which a change
in temperature of the fluild occurs and the time at which this change
is reflected in the thermocouple output signal. This time lag varies
with different thermocouple designs, pipe wall thicknesses, etc. The
time constant for this lag in the salt temperature thermocouples was
designated as'f£ and was considered to be 5 seconds.
-
=% #
¥ o G2 Ko
i
The time constant of the g(t) circuit wag%éhosen agt 10 times that
of the thermocouple. This lorgtime constant was necessary in order
to get "reset action" and still not interfere with the stabilizing
effect during transients.
The other three control signals are quite similar to €, and only
their differences fromfi will be pointed out in the following
descriptions of these signals.
Control Signal Nooza,el, o
The equation expressing€ is as follows:
%67;: m a ¢ - fa(Tc;la‘ T;Ja>~ g(t) p+ n (TOJT+ TJJ)--TSP
where,
f, = air flow rate across the radiator
TO = outlet air temperature from radiator
Ja
Ti = 1inlet air temperature to radiator
J a
The time constant used for the alr temperature sensing elements
was 2.5 seconds and that used in the g(t) circuit was 25 seconds
(T3 = 2.5and A}, = 0.04).
Note that the controlled variable is the same as forf& . The
stabilizing portion of the control signal is now formed by comparing
the rate of production of power in the reactor to the rate of re-
moval of power from the secondary salt by the alr flowing across
the radiator. Note that a multiplier is required in this circuit.
-5 -
The analog computer diagram used to f@rmulateé; is shown in Figure 5.
C. Control Signal No. 3363 o
The equation expressing €
%63 nia ¢ - (] JS>- 'g(fl + n (Tc]r+ Tflr>’2Tsp
secondary salt temperature at the radiator inlet
=
I
H
I
secondary salt temperature at the radiator outlet
—_ S
The controlled variable is the same as that 1n€ andC . The
stabilizing circuit is formed by comparing the rate of power production
in the reactor to the rate of power loss of the secondary salt as it
flows through the radiator. No multiplier is required since the flow
rate in the secondary salt system is constant.
The "time constant" potentiometer settings are the same as those used
in €, . The analog computer diagram used to obtain €, is shown in
Flgure 6.
D. Control Signal No. 4,€, .
The equation describing €
L€, { b (] - t)} (] )
This control signal is the same as €3 except that a different con-
trolled variable is used. The outlet fuel temperature from the
reactor is the controlled variable. The analog computer diagram
used to deriveé; is shown in Figure 7.
Procedure and Results: The system without a controller was shown to be
unstable subsequent to any appreciable perturbation. The system was also
shown to be unstable when using the controller with only the second term
in the above control signals.
The stability of the system with the gbove controllers was checked sub-
sequent to large changes in the power demand or load. The changes in the
load for the four runs, each using one of the four above described control
signals to the controller, were not precisely equal in magnitude and rate
of change. The change in load was accomplished by manually turning a
potentiometer. Also, no attempt was made to get optimum settings for M
and N in each case. Therefore, the results cannot be compared quantita-
tively. In later runs linear ramp load changes will be used, and optimum
-6 -
values of M and N used, so that wortrollers can be compared. Record-
ings of the controlled variliable and the neutron flux were made subssgquent
to a load change, while uging each of the four control signals to the
controller. The conditiong for these runs were ag follows:
A U81ng;€' as the control signal, M, as shown on the computer
diagram, wag set at 877 (qutg arbitrarily) and N was set at
0.5, The load, or the heat removal rate by the air across the
radiator, was se+ at approximately 2 megawatt and the system
permitted to stabilize. The load was increased from %'mw to
10 mw in 15 seconds, approximately at a constant rate. The
curves obtained are shown in Figure 8. On all the curves only
a relatively short time is shown. It can be seen that the curves
are converging, which indicates stability.
B. U31ng;€' as the control signal, M, as shown on the computer
dlagram,was set at 0.877 and N set at 0.5. The load was changed
from approximately 1.6 mw to 10 mw.in 17 seconds. The resguiting
curves are shown in Figure 9.
C. [knr@;f' as the coatrosl signal, M, as shown on tha computer
dlagramfl was set at 0.25 and N was set at 0.5. The load was
changed from approximately 1.6 mw to 10 mw in 13 seconds. The
resulting curves are shown in Figure 10.
De Using € 4 @8 the control signal, M, as shown on the computer
diagram, was set at 0.50 and N was set at 1.00. The ioad was
changed from approximately 1.6 mw to 10 mw in 11 seconds. The
resulting curves are shown in Figure 11.
The conclusion reached wag that the system would be stable using the con-
troller with any of the four control signals.
It should be pointed out that th= congtants M and N on the actual in-
stallation could be changed ov=r a congiderable range. No attempt was
made to get the optimum settings on the computer, due to time limitations.
ORHL-LR-D—wg. 64899
UNCLASSIFIED
PUMP
PUMP s e |
g | 200 GAM. Tes s, | "
- =
.T’:‘P‘/j Tes ‘ ¥
& v
‘ A T |
‘T;]R .T;z ‘ & -Tg TS3
- Tee _ t | AtrR —
'T,'Ja .,:j £ T ™ ]
a —* ————
—
, | L
REACTOR | 'T;j; s s
- | , RADIATOR
F1G. 1 BASIC Flow DIAGRAM OF MSRE SYSTEIM
Figure 2
TDENTIFICATION OF TEMPERATURE SYMBOULS
Te - Circulating fuz2l mean temperature in the reactor corsa.
Tro - Circulating fusl temperaturs at the outlet of the reactor corsz.
Tf3 - Circulating fus=l tzmperature at the inlet to the primary heat
exchanger.
Lel - Circulating fuel mean tempsrature in the primary heat exchanger.
Tf5 - Circulating fuel Temp ture at the outiet of ths primary h=at
exchanger.
Trg - Circulating fusl temperature at the inlet to the reactor cors,
Tg - Mean temperaturs of the graphits in the rsactor z0rz.
Emp - Mean temperature of the metal in the primary heat exchang=r wa.l.
Ty - Mean *temperature of the secondary salt in the primary heat excrangs=r.
Teo - Secondary salt temperaturs at the outlet of the primary heat exchangexz,
Ts3 - Secondary salt temperaturs at ths inlet to the radiator.
Taly - Mean temperaturs of the s=zomdary salt in ths radiator.
Lss5 - Secondary salt tempsraturs at the radiator outlet.
Ts6 - Secondary salt temperaturs ab tos inlet to the primary beat sxzarger
Lo - Mean *temp=raturs of the metal in the radlator.
Thot - Mean circulating fuel temperaturs in the "hot leg' of the primary
system.
Tcold Mean circulating fuel temperaturs in toe "oold leg" of the rrimary
systeto
Tha, - Mear air temperatire in the radlator.
Figure 2 (contd.)
Fuel temperature at reactor core inlet.
Fuel temperature at reactor core outlet,
Secondary salt temperature at the radiator inlet.
Secondary salt temperature at the radiator outlet.
Cooling air temperature at radiator inlet.
Cooling ailr temperature at radiator outlet.
= 10 -
Figure 3
’
) - \
MSRE DESIGN POINT DATA AS OF 12—13160
Reactor inlet temperature: 1175 O
Reactor outlet temperature: 1225 °F
Mean graphite temperature: (with no fuel absorption) 1230 °F
Residence time in reactor: | 7.63 sec.
Film drop from graphite to fuel: Linear with power
Heat capacity of graphite: 0.425 %EE_
# OF
Prompt ]?’and neutron heating in graphite: 6% of 10 MW
Residence time in piping from reactor outlet to H. E. inlet 3.09 sec.
Residence time in H. E. 2,24 sec.
Heat capacity of metal in H. E. | 200 BTU/°F
Avg. film drop between primary coolant and metal at D. P. 55.2 OF
Avg. drop in metal at D. P. | 56.7 OF
Avg. film drop between metal and secondary coolant at D. P. 26,1 OF
Film drop between primary coolant and metal as function of
flow: See graph, displace curve if necessary so that at 6.2
fps velocity /\T = 55.2 °F.
L .
Mean secondary coolant temperature at D. P. 1062 F
Residence time in piping between H. E. outlet and reactor 9.04 sec.
inlet (including coolant annulus) |
Total circulation time 22,0 sec.
Temperature coefficient of reactivity of graphite: -6 x 10-5CSK/K=OF
Temperature coefficient of reactivity of fuel: -3.3 x 10720 k/k-CF
Melting point of primary coolant: 8up °F
Melting point of secondary coolant: 860 °F
- 1] -
Figure 3 (contd.)
Check points:
N
- Thermal resistances: ft. hr. OF
BTU
. . : _l
o in primary coolant film: 3.28 x 10
| -l
in metal: 3.32 x 10
: . =l
in secondary coolant film: 1.56 x 10
Simulator data for secondary 1loop
Air temperature rise in radiator 200 °F
Air suction temperature 100 °F
Air flow 166,000 cfm
(7.11 x 10° #/nr)
Heat capacity of radiator L2 BTU/OF
. BTU
Heat capacity of secondary salt 0.57
- # OF
A~
Density of secondary salt 120 #/ft3
Residence times of secondary salt:
in primary heat exchanger 1.75 ség;'{
in piping to radiator 5.20 sec.
in radiator 7.14 sec.
in piping from radiator 10.11 sec.
Total 2L .20 sec.
Residence time of air in radiator 0.0l sec.
Temperature differences in radiator:
in salt film 13.4 CF
. in tube wall 78 .4 OF
in air film (0.7 O
AN
- 12 -
ORNL-LR~Dwg. 64900
+7;JF\’ | - H¢t) /‘
5 3 NN
‘ CP w -&- (e =721 —#4)] ‘
+ €,
. = o.l(f,g—{)
=&, = M{,a.cp =(Tde- T’T-JR)*?('&)} * N{(.T;JR.'-E]R) -c TSP}
FIG 4. GENERATOR CIRCUIT FOR €,
- 13 - |
ORNL<=LR=DWg .. 64901
Unclassified
- %(t)/l
N
—fa b= £ (T] )~ o)
| .
SENSe L £,
. TIME . ‘
'T‘,_j , LAG | ( )
S
FIG.5 GENERATOR CIRCUIT FORE,.
- 14 -
.
+T;JR ( >
Unclessified
ORNL-LR-Dwg. 64902
1)
I
T A LA "{Qtp ~(n]5-T°]5)~?(t)}
l
/gls
G
+
A,
o
4
©
®
| N SENsoR
+—r;jr? | TimMmfE LAG
Y
7y | |
| | “{('73.7«"* TL]R)' Z’TS"}
—lo0oV %fi X %7
o
A, = 0-}’ ('Cll"s3
Le =mfad-(T- -r;]s)__?cfl} + N{(Te] T ) =2 Ter
G €3
FIG.6 GENERATOR CIRCUIT FOR €3.
- 15 -
ORNL-LR-Dwg . 64903
Unclassified
- |
L
Ts
Trine LA fad ~(1,~ 7)) - 1#)f
Ae
-D )
+ ¢ a
—O—
|
SENSOR /"T'
“TTIME LAS /)
_, 0 o
+ -T”JIP Z . \\, -+ 64
\. | \\
L
G
~/ooVv
Ao E 0. (6"})
Loe, = m{acp -'(72]3.“73]5)‘?(‘&)} + N (T = Tsr)
FIG.7 GENERATOR CIRCUIT FOR €,.
- 16 =
(°F)
121
in Reactor
1200
1190
Mean Fuel Temp.
Nuclear Power (mw)
0
Elapsed Time from Start of Transient (sec.)
- 17 -
ORNL~LR-Dwg. 6490k
"w
v
%,
%fi:’,
3 ¥
M b
1220
(°F)
1210
in Reactor
1200
1190
Mean Fuel Temp.
10
Nuclear Power (mw)
O
Elapsed Time from start of Transient (sec.)