Notifications
You must be signed in to change notification settings - Fork 10
/
ORNL-TM-2974.txt
1783 lines (1071 loc) · 47.8 KB
/
ORNL-TM-2974.txt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
b2 ¥
oW
A
1970
1AY 8
v
RECEIVED L7 DIE
OAK RIDGE NATIONAL LABORATORY
operated by
UNION CARBIDE CORPORATION
NUCLEAR DIVISION
for the
U.S. ATOMIC ENERGY COMMISSION
ORNL- TM- 297h4
COPY NO. -
DATE - April 7, 1970
PLANS FOR POST-OFERATION EXAMINATION OF
THE MOLTEN-SALT REACTOR EXPERIMENT
P. N. Haubenreich and M. Richardson
ABSTRACT
In December 1969, after more than 4 succe .ful years, the nuclear
operation of the MSRE was concluded and the plant was placed in standby.
Work planned for early in FY-1971 includes removal of some core graphite;
viewing inside the reactor vessel and inside the fuel-pump bowl; inspection
of portions of the salt piping, the offgas charcoal bed, the coolant salt
pump, and the control rods; and testing the coolant salt flowmeter, FEach
study is justified by its benefit to the Molten-Salt Reactor Program.
Procedures and tools are available for some jobs; for others, they are
currently being developed. .
Keywords: reactors, fused salts, MSRE, operation, inspection,
maintenance, remote handling, leaks,
NOTICE This document contains information of a preliminary nature
and was prepared primarily for internal use at the Oak Ridge National
Laboratory. It is subject to revision or correction and therefore does
not represent o final report.
3 TED
I—~--———-—--———---i——-_—w-fi—#-«—— LEGAL MOTICE ———rrmm o oo rmoem oo
L
; This report was prepared as an account of Government sponsored work. Neither the United States,
nor the Commissien, ner any perscn acting on behalf of the Commission:
A. Makes any warranty or representation, expressed or implied, with respect to the accuracy,
completeness, or usefulness of the information contsined in this report, or that the use of
any informatien, apporatus, method, or process disclosed in this report may not infringe
privately owned rights; or
B. Assumes any liabilities with respect to the use of, or for damages resulting from the use of
any information, apparatus, method, or process disclosed in this report.
As used in the above, '‘person acting on behalf of the Commission’” includes any employee or
contractor of the Commission, or employee of such contractor, to the extent that such employee
or contractor of the Commission, or employee of such contractor prepares, disseminates, or
provides access to, any information pursuent to his employment or contract with the Commission,
or his employment with such contractor.
>
T
CONTENTS
ABSTRACT . . . . &
e : : e e e e e e e e e e e e e e e e e e e
GOA L L T T |
CRIiszz %O?T OPERATION EXAMINATIONS . . . . . : : : L
STEPS IN DEFINING THE CAMPAiG& : L
STUDIES AND TASKS TO BE UNDERTAKE& L
Investigation of Leak Near Freeze éaiv; %V:léS. L
Examination
of Surfaces Insi
gide the Fuel-Pu
-Pump Bowl .
© d
@
[
C
X . . * - .
l._J
,_J
Examination of Fuel Piping
|
H
Inspection of Fuel Drain Line
s
no
0 . .
xamination of Charcoal Bed Inlet
!
n
Examination of Radiator Tubing
=
no
a llla tl O O O . - * .
p w
P
g .
Test of
d/p System on Coolant Salt Flowmete .
. r . C e e
-
ol
e
W w
Inspection of Control Rods
|._4
+=
Verifi .
ification of Remote Maintainability
f_J
I~
=
N
Decontamination
—
\n
Securing the Plant.
[ -
(O
Disposal. . . . .
e e e e e e e e e e e e e e e e e e
SCI{EDUIE".. e & w8 ¢ & & s+ s+ e+ s =3 e s+ 2 e s s = . o
N N
355
LEGAL NOTICE
sponsored work, Nefther the United
This report Was prepar
States, noT the Commission, nor any perso
y warranty of 'repreneutat\on,
r usefulnees ©
atugd, method, oF praces?
uee of, or for damages resgulting from e
report.
» includes any €™
ined in thig Teport,
{ the information contal
t may not 1nfringe
A. Makes an
disclosed tn thif repor
racy, completen2ss, ©
of any information, appar
privately awned rightg; oF
B, Aspumes Y witk respect to the
ployee or contrac
such employee ar
diaseminates, or pr
with the Commissgion, T
f the Commission, or
0, WOY ipformation parsnant o his em!
went with auch coptractor.
contractoT ©
ovides access
pla employ
Vi PO T YT AN [ak! e~y T AT crs Y Y AR
st.: ksl L " tj‘r“ S ‘vj‘A . 277\1‘- i - : I \') L’ As.hj,i : !..i
E - SdaE T ’—.;l‘Ji'fl_‘A;: e ‘l" i { I
1
INTRODUCTION
The primary purpose of the Molten-Salt Reactor Experiment was to
demonstrate the practicality of the molten-salt reactor concept. To this
end its design! incorporated essentially the same materials and many of
the design features of proposed molten-salt power reactors. Its primary
purpose was accomplished as it was operated for more than 4 years at Qak
Ridge National Laboratory, Experience® with the MSRE was quite encouraging
and a great deal of new information (particularly with regard to fission
product behavior) was obtained, In December 1969, the reactor was shut
down because its original goals had been met and continued operation,
although offering additional information, could not be Jjustified in the
very stringent budget situation. Except for removal of an experimental
array from the core, all post-operation examination was deferred until
the next fiscal year, In the interim the reactor was placed in a standby
condition,”
GOAIS OF POST-CPERATION EXAMINATIONS
The broad goal of the post-operation examinations is to complete the
gathering of information from the MSRE by in-place inspection, removal of
specimens and some pieces of equipment, and detailed examination of these
in hot cells, Specific objectives include determination of the condition
of materials with the greatest exposure to the reactor environment, the
condition of key equipment (pumps, heaters, insulation), the location and
nature of deposits in selected parts of the fuel salt and offgas systems,
R. C. Robertson, MSRE Design and Operations Report, Part I —
Description of Reactor Design, ORNL-TM-728 (January 1965).
P, N, Haubenreich and J. R. Engel, "Experience with the MSRE,"
Nucl. Appl, Tech. 8, 118 (1970).
3p. N. Haubenreich and R. H. Guymeon, Plans for the MSRE Between End
of Nuclear QOperation and Beginning of Post-Operation Examinations,
internal memorandum MSR-69-121 (December 1969).
and the exact location and nature of a leak in a salt freeze valve. This
information will influence materials development and the design of equip-
ment and systems for future molten-salt reactors,
CRITERTA
The scope of the post-operation studies will be limited to those
whose costs are Justified by the benefits to the Molten-Salt Reactor Program.
Tentative plans call for holding the radicactive fuel salt (about
360,000 curies of fission products as of July 1970) frozen in the MSRE
tanks until such time as salt mine disposal is feasible. The post-operation
examinations shall not prevent the ultimate removal of the salt nor leave
the system in an unsafe condition in the interim. 1In addition, to pre-
serve the option of fluorinating the salt for uranium recovery, the opera-
bility of the processing facility shall be preserved.
Exposure of personnel to radiation during the post-operation exami-
nation shall not exceed normal occupational limits prescribed by ORNL
and the USAEC.
STEPS IN DEFINING THE CAMPAIGN
Planning for the post-operation examination, to some extent, began
with the design of the reactor, when provisions were made for removing the
5 central bars of core graphite. Final selection of post-operation studies,
of course, had to awalt operating experience and evaluation to point out
areas of most interest and other program developments (such as the budget)
to determine what could be justified.
In February 1969, the head of the MSRE Operations Department sent a
request for suggestions for final operations and shutdown of the MSRE to
group leaders in the MSRP. Responses were consolidated to eliminate dupli-
cations and in October 1969, a tentative list of post-operation tasks was
distributed with a request for comments. This list was discussed with ORNL
and AEC-ORO reactor safety review committees and with AEC-DRDT representa-
tives, After discussion and review of the tentative list with MSRP staff
members in which benefits were weighed against costs, the program described
in the next section was arrived at in March 1970.
STUDIES AND TASKS TO BE UNDERTAKEN
The studies that we propose to make are listed in Table 1. Under
each study are listed the separate jobs, some to be done on-site, some in
X-10 hot cells, involved in that study. DNot shown in the table are the
tagks of rewoving some items for use in development facilities, decontami-
nating areas outside the containment cells, securing the plant, and dis-
posing of the fuel salt. The Justification for and objectives of each
study (in the order listed in Table 1) and each task are discussed in the
text of this section., Job descriptions, including purposes and general
procedures, are presented in the next section.
Table 1
Iist of Studies to be Made and the Jobs that will be Involved
Investigation of leak near freeze valve FV-105
View vicinity of FV-105
Excise FV-105
Inspect FV-105
Examination of fuel-pump bowl internals
Excise sampler cage and baffle
View inside of pump bowl
Inspect sampler cage and baffle
Examination of reactor vessel internals
Prepare for core work
Remove access plug and rod thimbles
Remove some core graphite
View core and inside of reactor vessel heads
Close reactor access
Cut off piece of rod thimble
Inspect core graphite bar
Inspect rod thimble piece
Table 1 (continued)
Examination of fuel piping
Fxcise sections of piping at heat exchanger inlet and outlet
Inspect sections of piping
Inspection of fuel drain line
Remove heater H-103
View drain line inside reactor furnace
Examination of charcoal bed inlet
Excise inlet section of a main charcoal bed
Inspect inlet section
Examination of radiator tubing
Excise tubing near inlet and near outlet
Inspect for deposits and corrosion
Examination of thermocouple wells in coolant salt piping
Fixcise wells at radiator inlet and outlet
Inspect for deposits and integrity
Test of differential pressure system on coolant salt flowmeter
Cut coolant piping
Test pressure measuring system
Inspection of coolant pump rotary element
Remove rotary element
Inspect
Inspection of control rods
Examine
Remove elements
Inspect elements
Verification of remote maintainability
Remove and inspect heater units
Remove fuel pump motor
Disconnect fuel sampler line
Investigation of Ieak Near Freeze Valve FV-105
A leak appeared in the primary system on December 12, 1969 shortly
after the scheduled end of nuclear operation., Correlation of changes in
cell air activities with certain operations Indicated that a small leak
had developed in or near freeze valve FV-105 (leading to fuel drain tank
FD-2) about two hours after the fuel was drained for the last time,
Amounts of xenon and iodine indicated that a few ft° of gas and perhaps some
salt (1 cc or less) escaped into the cell before the leak was effectively
stopped by freezing salt in the line,
This is the only leak that ever occurred in the primary system and
the explanation is not known. Examination of radiographs and other con-
struction records showed nothing suspicious. We believe corrosion could
not have been a significant factor in the origin of the leak, and radiation
damage at this location should be virtually nil. The most likely hypothesis
is that thermal stresses in the valve caused a crack to originate at the
welded Juncture of the cooling-air shroud and the pipe and to propagate
through the pipe wall.
We should determine the exact location and description of the lesk
and, if' possible, derive an explanation,
Examination of Surfaces Inside the Fuel-Pump Bowl
During operation of the MSRE, effects related to the salt-gas inter-
face in the fuel-pump bowl were of considerable Importance. Bubbler level
elements indicated that considerable amounts of gas were carried under the
salt surface by the xenon stripper jets. The density profile above the
bubblers could not be measured, but the fluid surface was certainly higher
because of the gas. There is reason to think that the surface was not
quite uniform (being lower inside the sampler baffle, for example), Certain
fission products tended to concentrate at salt surfaces, with perhaps some
going into the gas space as a "smoke." 01l leaked into the pump bowl from
the shaft bearing region at a few cc per day, ©Some oil decomposition pro-
ducts probably deposited on the pump bowl surfaces and some on the salt
where they may have influenced fission product separation and bubble be-
havior. Thermocouple readings indicated that fission product heating of
10
the pump bowl above the salt level was moderate but changed from time to
time for unknown reasons.
A sample capsule was dropped into the pump bowl in August 1967 and
another in March 1968. The steel cap of the first capsule was retrieved
in May 1968, There was some evidence that the second capsule was Jjammed
between the cage and baffle during recovery attempts.
We should observe surfaces inside the pump bowl for evidence of depo-
sition and the patterns displayed. It appears now that it will probably
be practical to cut out a section of the pump bowl top with the sample
cage and baffle attached. This would make 1t possible to determine much
more about the deposits and also to inspect for evidence of corrosion,
(Conditions in the vicinity of the dissimilar metal junctions in the sample
capsule are particularly interesting.) The information will aid in under-
standing the MSRE behavior and will be useful in evaluating design of off-
gas systems for future molten-salt reactors,
Examination of Reactor Vessel Internals
The effect of reactor operation on core materials was monitored by ex-
posure at the center of the core of experimental arrays containing speci-
mens of graphite and Hastelloy-N like those used in the construction of
the MSRE. Arrays were removed after 1087, 4510, 9005, 11,555, and 13,172
equivalent full-power hours., Usually the replacement array included some
subassemblies with previous exposure, so very long total exposures were
accumulated on some specimens before detalled examination and testing.
The conditions of the specimens, which were assumed to be typical of the
core, never gave any cause for concern over the condition of the core,
Although this surveillance program was presumably quite adequate, its
vallidity can be supported by examination of portions of the core graphite
and Hastelloy-N exposed from start to end of the MSRE operation,
The condition of Hastelloy-N can be determined by inspection of the
removable core access assembly, which Includes the control rod thimbles
and a plug exposed to the fuel stream in the core exit, After the assembly
has been visually inspected in the reactor cell, a portion of a rod thimble
can be cut off and examined closely in a hot cell, Metallographic
11
examination of interior surfaces will reveal any effect of the exposure
to the cell atmosphere used for cooling. The exterior surface will show
effects of very long exposure to the fuel salt. (It will not be practical
to shape specimens for physical property testing from the thimbles, but
this is unnecessary since irradiation effects were well described by the
specimens from the experimental arrays.)
Removal of one of the five central stringers will make available
graphite exposed to fuel flowing through channels with a cross section
typical of the bulk of the core. Surface appearance and penetration of
salt constituents and fission products in regions free of flaws should be
compared with results from the experimental arrays.
There was no detectable evidence of any physical damage to the core
during operation, nor did thermocouple readings on the lower head and near
the core support flange indicate any substantial accumulation of sediment,
Nevertheless, a look will be worthwhile, An optical device and light can
be used to view and photograph the top of the core and the upper head of
the reactor vessel, the lower grid structure, the bottom head, and the
drain line inlet., If loose fragments, broken graphite, sediment or other
deposits are discovered, they should be examined as closely as 1s practical.
Examination of Fuel Piping
The MSRE operated for 13,172 eguivalent full-power hours with a
temperature difference of LO°F between the fuel entering and leaving the
heat exchanger. Close examination and comparison of Hastelloy-N surfaces
exposed to fuel at the extremes of the temperature range will provide in-
formation on corrosion and mass transport under the reactor conditions.
Short sections of the 5-inch pipe near the heat exchanger inlet and be-
tween the heat exchanger and the reactor vessel should be cut out and
examined metallographically for this purpose,
Inspection of Fuel Drain Line
The Jjuncture of the fuel drain line with the reactor vessel was sub-
jected to a combination of stress and irradiation about as severe as any
in the reactor. Removal of this section is not practical, but it can be
viewed from a distance by removal of heater H-103 and insertion of viewing
12
devices in its place inside the reactor furnace., The juncture, the drain
line, and the exterior of the insulation box around the drain valve should
be scrutinized for any evidence of incipient trouble,
Examination of Charcoal Bed Inlet
During the initial escalation of the MSRE power in 1966, plugging
occurred at several points in the fuel offgas system, including the inlets
of the charcoal beds. Even after the installation of an efficient filter
(the "particle trap"), plugging recurred at the charcoal bed inlets, This
was believed to be due to polymerization of oil vapors downstream of the
filter and accumulation of the polymers on the steel wool in the entrances
of the beds. This could not be verified directly, but the restrictions
could be cleared temporarily by lowering the cooling water level around
the beds and applying heat to the inlet section. There was concern over
possible reduction of the adsorptive capacity of the charcoal by the oil
residues but no change was detectable from the few thermocouples spaced at
80-ft intervals in the bed. A short section of the inlet to one section
of the beds should be cut out and the explanation for the recurrent plugging
verified, A sample of charcoal from the inlet should be tested and if its
adsorptive capacity is seriously reduced, samples should be obtained from
further along the bed to determine the extent of the effect.
Examination of Radiator Tubing
The chromium concentration of the coolant salt remained very low
through the entire operation, indicating that corrosion was extremely low
or that corrosion-product chromium was being deposited. There were no
corrosion surveillance specimens in the coolant system, Sections of the
3/k-inch tubing should be cut from the radiator near the inlet and outlet
ends and examined for information on corrosion in the coolant systen,
Examination of Thermocouple Wells in Coolant Piping
Because of the desire to eliminate, insofar as possible, conceivable
sources of trouble, the MSRE design included only 2 thermocouple wells in
salt piping: one each at the inlet and outlet of the radiator, The pipe
with these wells should be cut out and sectioned and a careful inspection
13
made to see if the wells suffered any unusual corrosion. The pessibility
of deposition on what were to some extent "cold fingers" should also be
investigated,
Test of d/p System on Coolant Salt Flowmeter
There is a significant discrepancy between the reactor power that was
indicated by the system heat balance and the power indicated by observed
changes in isotopic ratiocs of uranium and plutonium in the fuel., The
latter indicated up to 10 percent lower power than the heat balance. The
possible reasons for the discrepancy have been checked one by one until
now only the coolant salt flow rate has not been verified as thoroughly as
possible, This must be done. The ultimate test will consist of cutting
the salt lines near the venturi flowmeter and applying signals to test the
entire transmitting and modifying systen,
Inspection of Coolant-Pump Rotary Element
The salt pumps are key components in a molten-salt reactor. Except
for the small amount of oil leakage (about 2 - 5 cc/day) into the pump
bowls, there was no problem with either the coolant-salt or fuel-salt
pump in the MSRE, The problems due to oil leakage were not serious enough
to warrant replacing the original units with seal-welded replacement rotary
elements that would have had no oil leakage into the bowl. As a result,
the original units served for the entire duration of the operation. An
inspection should be made to determine the condition of the pumps and to
permit some judgement as to remaining service life., The fuel and coolant
rotary elements are essentially the same, but the coolant pump operated
considerably longer, pumping salt for 26,076 hr compared to 21,788 hr for
the fuel pump. Since the coolant pump rotary element is also nonradio-
active and more accessible, it should be removed and thoroughly inspected,
Inspection of Control Rods
The control rods in the MSRE, of a unique, flexible design, on the
whole performed well, There were gradual changes in drop times, however,
that were attributed in part to changes in the flexibility of the rods
with long exposure and use. On occasion, rods were pulled out of the
1k
thimbles and viewed from a distance in the reactor cell for evidence of
unusual scratches or dragging. (None was found.) It was not possible to
inspect the internals of the rod or to ascribe a reason for changes in
flexibility.
The rods must be pulled to gain access to the core and at that time
the active section of one should be removed for examination in a hot cell,
The Inconel-canned Al-0=-Gd0s ceramic poison elements should be checked
for dimensional changes and the flexible metal hose and rod should be
closely inspected,
Verification of Remote Maintainability
An important goal of the MSRE was to demonstrate that maintenance of
the molten-salt reactor, with its highly radioactive fuel circulation sys-
tem, was in fact practical, To this end, the radiocactive portions, in-
cluding virtually everything in the reactor cell, were designed to be
replaceable., Replacement of core specimens, work on the offgas system,
replacement of alr-line disconnects, and repair of the fuel sampler-
enricher and in-cell heater units demonstrated the feasibility of the
general approach, Some features were not tested, however, because most
of the equipment required no maintenance, It would be worthwhile to try
certain of these features., The difficulty of replacing the fuel-pump
motor should be determined by removing the old motor or at least loosening
several of the flange bolts. The flanged section of the sampler tube,
which was designed to be swung out of the way for pump bowl replacement
should be removed as intended., (This needs to be done in preparation for
cutting into the pump bowl.)
Removal of Coolant Salt Pump Bowl and Piping
It has been proposed that a fluoroborate technology test loop be con-
structed, using the MSRE coolant pump and other portions of the coolant
salt system, ©Since portions ouwtside the reactor cell are not radioactive,
removal would be a straightforward task that can be done when needed. The
only consideration is that lines leading into the reactor cell be sealed,
since they are penetrations of the containment envelope.
15
Recovery of MSRE Coolant Salt
Salt for a proposed loop to test gas injection and stripping tech-
nology can be prepared most economically by adding ThF, and LiF to the
MSRE coolant szlt, The coolant salt, 2610 kg of LiF-BeF- (66 - 34 mole
percent), should be melted and removed when required for this purpose.
This operation will also test some aspects of techniques that may be used
eventually in disposal of the fuel salt,
Decontamination
The spread of radicactivity during the work described above will be
controlled by proper ventilation, temporary containment enclosures, the
establishment of contamination zones, and other techniques that have been
proved in use at the MSRE and elsewhere in CORNL. When necessary during
the campaign and at its conclusion, some of the contaminated tools and
material will be disposed of and the rest will be decontaminated., Before
the task is finished, everything outside the containment will be decon-
taminated to safe levels,
Securing the Plant
There is currently no demand for the fissile material in the MSERE
fuel salt (37 kg U, 84% EB%J). Because of the extremely high =33 content
(220 ppm) and consequent radiation problems, it is doubtful that the
uranium will ever be worth the cost of recovery from the salt., We propose
to keep the fuel salt frozen in the MSRE drain tanks, safely contained
until developments make it possible to decide on the optimum method of
disposal, Meanwhile the option of stripping the uranium by the fluoride
volatility process will be retained by preserving the M3RE processing
plant.
The MSRE reactor cell and drain tank cell will be resealed after the
examination work is completed, Service lines into the cells which were
left connected to the ancillary systems during the interim period will be
capped to minimize chances of accidental openings. The reactor equipment
that is heavily contaminated with fission products will be retained within
the cells and the offgas containment system. (As of July 1970, the total
16
fission product activity in the salt and elsewhere in the reactor will
amount to about 360,000 curies.) Some radioactive items with little or
no transferable activity may be placed in other shielded cells in the re-
actor building. Radiation zones will be defined, marked and secured as
required by ORNL procedures., The conditions in the reactor, cells, and
building will continue to be monitored remotely by the Central Waste Moni-
toring Group at ORNL. Access to the reactor building and grounds will be
strictly controlled by the existing system of fences, gates, and guard
service.
Disposal
Items that are not required for the containment of the radioactivity
nor for the possible future operation of the processing facility will be
identified and advertised. Those items whose removal can be Jjustified by
Program needs will be removed. ©Such removal will be planned and super-
vised to guard against inadvertent compromise of the continuing needs of
the MSRE,
The safety of the plant will be reviewed periodically by appropriate
groups 1in ORNL,
We expect that eventually it may become desirable to transfer the
fuel salt, containing the fissile material and the bulk of the fission
products, to a more permanent waste storage situation. The best way to
get the salt out would now appear to be to cut the line from the salt
fluorination tank to the experimental salt still and transfer batches of
molten salt into transport containers connected at that point. It would
also be feasible to pull salt into containers through a dip tube installed
through the drain tank access port. After the bulk of the activity is re-
moved this way, 1if there 1s no foreseeable need for eguipment in the re-
actor and drain cells, the cells can be filled in and closed to provide
permanent containment for the remaining activity.
17
JOB DESCRIPTIONS
This section gives some additional detail on the jobs that will be
involved in the studies described in the previous section., The letters
in each job identification refer to the principal location of the work
(RC = reactor cell; DC = drain cell; CC = coolant cell; HC = hot cell =t
X-10; O = at reactor site outside of cells; L = laboratory). The numbers
in the job identification refer to the sequence in which the work will
probably be done (see Table 2), The order in which the jobs are discussed,
however, is that in which they are listed in Table 1. The "purpose" is
the specific contribution toward the broader objective of the study of
which the job is part, A preliminary description of the procedure is
given to indicate the scope of the job and the present plan of attack.
The detailed procedures have yvet to be developed and proved in most cases.,
View Vicinity of Freeze Valve FV-105 (Job DC-1)
Purpose — To look for evidence of the leak and its cause, If any
is found, to decide more precisely the probable location of the leak, If
any salt is observed, to determine the amount and its condition. To ob-
tain measurements and photographs to be used in detailed plans for excision
of section with the leak,
General Procedure — Remove drain cell top blocks, cut membrane, set
up maintenance shield, remove lower blocks, insert lights and viewing
devices, take photographs, remove heater units in viecinity of FV-105, view
and photograph, remove tools, reinstall blocks, remove maintenance shield,
Excise FV-105 (Job DC-2)
Purpose — To remove the section of drain line where the leak has
been found (or is believed to be) so that detailed inspection can be made.
General Procedure — Set up maintenance shield, remove lower block,
install lights and viewing devices, Clear away interfering wiring,
18
insulation and supports., Use pipe cutter to sever lines, Lift sections
to be inspected into shielded carrier and transport to hot cell, Thread
ends of line in cell, close with pipe caps, test. Remove tools, etec.,
replace block, remove maintenance shield, seal membrane, install top
blocks,
Inspect FV-105 (Job HC-6)
Purpose — To ascertain the location, nature and probable cause of
the leak,
General Procedure — (In hot cell) — If leak is in FV-105, remove
cooling-air shroud. Inspect exterior visually and by dye-penetrant tech-
nique. ©Section and examine metallographically.
Excise Fuel Pump Sampler Cage and Baffle (Job RC-13)
Purpose — To remove this assembly to a hot cell for detailed exami-
nation. To provide an opening through which the interior of the fuel-
pump bowl can be viewed.
General Procedure — Set up maintenance shield, install lights and
viewing device, Remove FP heaters and leads. Use plasma torch to cut
away interfering portion of support plate and ring. Remove flanged sec-
tion of sampler tube, then cut tube Jjust above bowl cooling shroud, Cut
out ring of shroud around tube, Use plasma torch to cut through upper
head of FP bowl in cirecle close around sampler baffle, Lift short sec-
tion of sample line with attached latch stop, capsule cage and baffle
into shielded carrier and deliver to hot cell,
Inspect Sampler Cage and Baffle (Job HC-h)
Purpose — To determine the nature of any deposits on the metal sur-
faces inside and outside of the baffle and how the deposition varied at
and above the salt-gas interface. To see if the 10-g capsule that was
19
dropped in March 1968 is still wedged outside the cage as it seemed to
be. To examine specimens from selected spots for evidence of corrosion.
General Procedure — (In hot cell) — Remove assembly from carrier,
view and photograph. Section vertically and horizontally. Remove de-
posits from some sections mechanically, from others chemically, Prepare
specimens for metallographic examination,
View Inside Pump Bowl (Job RC-1k)
Purpose — To make observations and photographs that can be used
with the results of Job HC-4 to describe the deposition of salt mist,
0il residues (and perhaps fission products) on the various surfaces ex-
posed to salt and gas in the pump bowl,
General Procedure — After removal of the sampler cage and barffle
(Job RC-13) look down at bottom head below hole and photograph it. In-
sert viewing device with light through the hole (about 3-in. diameter).
Look at and photograph top head, top and bottom of "shed rocof," overflow
line, volute support cylinder, and volute. ILook for remains of capsules
and latch key in bottom head. Remove viewing equipment.
Close Fuel Pump Bowl (Job RC-15)
Purpose — To prevent free communication between the inside of the
fuel system and the cell atmosphere under credible future conditions,
(There would seem to be no way for the pressure differential to exceed
5 psi or the %temperature to exceed 200°F.,)
General Procedure — Prepare a patch to fit over the hole and seal
against the pump tank, Apply the patch, remove tools.
Prepare for Core Work (Job RC-2)
Purpose — To clear the way for opening the core access flange, To
make the control rods available for inspection.
20
General Procedure — Set up maintenance shield. (The upper blocks
and part of the reactor cell membrane will have been removed in Job RC-1.)
Disconnect control rod drives and move to spare cell. Remove control rods
and hang in reactor cell. Remove the graphite sampling standpipe. Clear
away control rod drive shielding, bracing and any other obstruction from
the reactor access flange area,
Remove Core Access Plug and Rod Thimbles (Job RC-T)
Purpose — To give access to the interior of the reactor vessel. To
permit inspection of Hastelloy-N that has received long exposure in the
core. To permit examination of plug surfaces for evidence of unusual de-
position around the salt-gas interface.
General Procedure — Unbolt, 1ift out, and hang in the reactor cell.
Remove Some Core Graphite (Job RC-8)
Purpose — To provide a bar of graphite from the core for examination
in a hot cell,
General Procedure — Lift one of corner bars into a carrier and de-
liver to hot cell, (A second bar, perhaps the center, may also be re-
moved., )
View Core and Inside of Reactor Vessel Heads (Job RC-9)
Purpose — To look for evidence of unusual deposits in low-velocity
regions, any fragments of graphite or other loose objects, and any broken
graphite stringers.
General Procedure — ILower viewing device and light into upper head.
View and photograph inside of core access nozzle and fuel outlet on the
way down, View and photograph in upper head with particular attention to
top of graphite and retaining wires, Lower device through core, scanning
for anything unusual. View and photograph horizontal graphite, support
grid, flow directors and surface of lower head, Remove viewing devices,
21
Close Reactor Access (Job RC-10)
Purpose — To prevent free communication between the inside of the