Generates a Excel report from SAP B1 data
Requires the addition of a "Job_Schedule_ReportPhase" stored procedure on your MS-SQL or HANA server (note - HANA untested).
Shows all jobs for the time range desired that have been completed but yet to be invoiced or batched.
Requires a SAP B1 deployment with the Eralis Jobs addon.
I don't believe it requires any special UDF's, but will require some re-factoring to have this program producing desired results for your server.
Requires a connection string be placed on SAP_DATA_PULL.cs on line 39.