Fix scandir #124
Triggered via pull request
September 4, 2024 08:22
Status
Cancelled
Total duration
1m 32s
Artifacts
–
tests.yml
on: pull_request
Build & Unit
53s
Matrix: E2E Test
Annotations
12 errors and 1 warning
E2E Test (LocalTest)
Canceling since a higher priority waiting request for 'Tests-refs/pull/112/merge' exists
|
E2E Test (LocalTest)
The operation was canceled.
|
E2E Test (DOSpacesTest)
Canceling since a higher priority waiting request for 'Tests-refs/pull/112/merge' exists
|
E2E Test (DOSpacesTest)
The operation was canceled.
|
E2E Test (BackblazeTest)
Canceling since a higher priority waiting request for 'Tests-refs/pull/112/merge' exists
|
E2E Test (BackblazeTest)
The operation was canceled.
|
E2E Test (WasabiTest)
Canceling since a higher priority waiting request for 'Tests-refs/pull/112/merge' exists
|
E2E Test (WasabiTest)
The operation was canceled.
|
E2E Test (S3Test)
Canceling since a higher priority waiting request for 'Tests-refs/pull/112/merge' exists
|
E2E Test (S3Test)
The operation was canceled.
|
E2E Test (LinodeTest)
Canceling since a higher priority waiting request for 'Tests-refs/pull/112/merge' exists
|
E2E Test (LinodeTest)
The operation was canceled.
|
Build & Unit
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3, docker/setup-buildx-action@v2, docker/build-push-action@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|