You've been tasked with writing software for a thermostat that will control HVAC hardware (heater, blower, air-conditioner). This hardware must be operated according to the manufacturer's specifications in order to run safely and effectively.
To effectively regulate the environment the temperature should never deviate more than 5 degrees from 70F. If the temperature is ever more than 10 degrees away from 70F then the appropriate Hi or Lo alarm must sound.
Bad news: The various hardware devices have not yet arrived so we can't connect to them yet. Good news: We have the hardware documentation! The hardware interfaces are defined as follows:
package contracts
type Thermometer interface {
CurrentTemperature() int // Current ambient temperature rounded to the nearest degree (Fahrenheit).
}
type HVAC interface {
SetBlower(state bool) // Turns the blower on or off.
SetCooler(state bool) // Turns the cooler on or off.
SetHeater(state bool) // Turns the heater on or off.
IsBlowing() bool // Is the blower currently on or off?
IsCooling() bool // Is the cooler currently on or off?
IsHeating() bool // Is the heater currently on or off?
}
type Alarm interface {
SetColdAlarm(state bool) // Turns the cold alarm on or off.
SetHeatAlarm(state bool) // Turns the heat alarm on or off.
ColdAlarm() bool // Is the cold alarm currently on or off?
HeatAlarm() bool // Is the heat alarm currently on or off?
}
On and off are analogous to the go values true
and false
, respectively.
- When the heater is on, the blower must also be on.
- When the cooler is on, the blower must also be on.
- The blower must continue to run for 5 minutes after the heater is turned off.
- Because the heat exchanger has latent heat that must not be allowed to accumulate lest it melt the sensitive vanes.
- The cooler must not be turned on within 3 minutes of being turned off.
- Because the freon must be given time to re-condense lest the compressor vapor lock.
- How will the passage of time be marked?
- How can the thermostat be developed and tested given that the hardware has not yet arrived?
Basic Logic:
- TODO: 1. on startup everything is off
- TODO: 2. turn on cooler and blower if too hot
- TODO: 3. nothing turns on if temp just right
- TODO: 4. turn on heater and blower if too cold
Intermediate Logic:
- TODO: 1. cooler turns off if too cold again
- TODO: 2. heater turns off if too hot again
- TODO: 3. blower stays on when cooling after heating
- TODO: 4. blower stays on when heating after cooling
Advanced Logic:
- TODO: 1. heater turns off but blower remains on for 5 minutes after heating
- TODO: 2. cooler must remain off for three minutes before restart
- TODO: 3. cooler does not turn back on after delay if not needed
Alarm Logic:
- TODO: 1. turn on heat alarm at threshold
- TODO: 2. turn on cold alarm at threshold
- TODO: 3. no alarm returned if temp nominal
- TODO: 4. no alarm returned when high temp <= nominal
- TODO: 5. no alarm returned when low temp >= nominal