-
Notifications
You must be signed in to change notification settings - Fork 7
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
- Loading branch information
Showing
3 changed files
with
20 additions
and
4 deletions.
There are no files selected for viewing
File renamed without changes.
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,18 @@ | ||
--- | ||
layout: default | ||
title: Installing the switches | ||
nav_order: 10 | ||
parent: Build guides - Charybdis | ||
--- | ||
|
||
# Table of contents | ||
|
||
1. TOC | ||
{:toc} | ||
|
||
# Introduction | ||
|
||
Now that everything is connected together, the next step is to install the switches and the PCBs into the case. The process is exactly the same for both sides, so we will detail only the Scylla side (without trackball). | ||
|
||
{: .note } | ||
You may have noticed that we still haven't done anything with the sensor PCB. This is normal, we will connect it after installing the switches. This is so that it doesn't get in the way when soldering the switches. |