Skip to content

Commit

Permalink
maintenance
Browse files Browse the repository at this point in the history
  • Loading branch information
bstiq committed Oct 22, 2023
1 parent d030ecf commit 614f886
Show file tree
Hide file tree
Showing 3 changed files with 20 additions and 4 deletions.
File renamed without changes.
6 changes: 2 additions & 4 deletions bg_charybdis/09cables_to_splinky.md
Original file line number Diff line number Diff line change
Expand Up @@ -18,10 +18,9 @@ Be careful, because the Splinky shield assemblies are not reversible ! We will s

# Left side

**For the following step, please prepare:**

![](../assets/pics/guides/charybdis/44.jpg)

**For the following step, please prepare:**
- Splinky shield assembly (left)
- flexible plates assembly (left, with 5 keys on the thumb cluster)

Expand All @@ -35,10 +34,9 @@ Install the cables coming out of the flexible PCB assembly into those connectors

# Right side

**For the following step, please prepare:**

![](../assets/pics/guides/charybdis/46.jpg)

**For the following step, please prepare:**
- Splinky shield assembly (right)
- flexible plates assembly (right, with 3 keys on the thumb cluster)

Expand Down
18 changes: 18 additions & 0 deletions bg_charybdis/10install_the_switches.md
Original file line number Diff line number Diff line change
@@ -0,0 +1,18 @@
---
layout: default
title: Installing the switches
nav_order: 10
parent: Build guides - Charybdis
---

# Table of contents

1. TOC
{:toc}

# Introduction

Now that everything is connected together, the next step is to install the switches and the PCBs into the case. The process is exactly the same for both sides, so we will detail only the Scylla side (without trackball).

{: .note }
You may have noticed that we still haven't done anything with the sensor PCB. This is normal, we will connect it after installing the switches. This is so that it doesn't get in the way when soldering the switches.

0 comments on commit 614f886

Please sign in to comment.