Skip to content

Commit

Permalink
Update docs/developer/serial-crystallography-on-i24/how-to/run-a-coll…
Browse files Browse the repository at this point in the history
…ection.rst

Co-authored-by: Dominic Oram <dominic.oram@diamond.ac.uk>
  • Loading branch information
noemifrisina and DominicOram committed Sep 13, 2024
1 parent 6fd007e commit 29e8d69
Showing 1 changed file with 1 addition and 1 deletion.
Original file line number Diff line number Diff line change
Expand Up @@ -56,7 +56,7 @@ For a pump-probe experiment, select ``True`` on the dropdown menu in
``Data Collection Setup`` and then set the laser dwell and delay times
in the ``Pump Probe`` panel.

**WARNING** This setting requires an
**WARNING** This setting requires a
hardware change, as there are only 4 outputs on the zebra and they are
all in use. When using the Eiger the Pilatus trigger cable should be
used to trigger the light source. When using the pilatus the eiger
Expand Down

0 comments on commit 29e8d69

Please sign in to comment.