Start updating roadmap
Browse files Browse the repository at this point in the history
  • Loading branch information
noemifrisina committed Sep 11, 2024
1 parent 3413415 commit 5352ad0
Showing 1 changed file with 63 additions and 46 deletions.
Original file line number Diff line number Diff line change
Expand Up @@ -4,25 +4,73 @@ Roadmap
For a closer look at the ongoing work: `I24ssx
board <https://github.com/orgs/DiamondLightSource/projects/10/views/2>`__

Ongoing list of things needed:

1. Solution for enabling users to run mx-bluesky instead of old scripts:
blocked by permission issues. Preferred solution would be run on
beamline kubernetes cluster - in the meantime also loooking into
procserv as a possibility. (Fixing this should also allow us to stop
using the Pilatus to make directories during an Eiger collection.)
Temporary workaround in place for beamline staff, who should be
starting to run this for testing/in house beamtimes.
2. Convert detector set up to use bluesky plans and ophyd_async devices.
Investigate using the existing Pilatus in ophyd_async which writes
HDF5 instead of CBFs (may want to make a CBF-writing Pilatus).
3. Start looking into moving away from edm screens towards a web-based
GUI.
4. Improve alignment of chip: get it to work correctly for multiple
Ongoing list of TODOs:

1. Improve alignment of chip: get it to work correctly for multiple
zooms.
- Close to being completed (see issue #44)
2. Refactor and fix the logger.
3. Solution for enabling users to run mx-bluesky instead of old scripts:
blocked by permission issues.
- This should also allow us to stop using the Pilatus to make directories
during an Eiger collection.
- The preferred permanent solution is to run mx-bluesky on the
beamline kubernetes cluster - I24 should be due to get on in
shutdown 4 2024.
- Other possibility is to run the ```blueapi`` server on procServ. An
example of this has now been set up on ws002 on the beamline and
is being tested.
- A temporary workaround in place for beamline staff, who should be
starting to run this for testing/in house beamtimes. Staff have started
using this set up in September 24.
4. Convert detector set up to use bluesky plans and ophyd_async devices.
- Eiger device in dodal needs to be converted to ophyd_async and updated
to work with different Eigers on several beamlines.
- Investigate using the existing Pilatus in ophyd_async which writes
HDF5 instead of CBFs, but we may want to make a CBF-writing Pilatus.
However, the Pilatus detector is due to be removed soon.
5. Start looking into moving away from edm screens towards a web-based
GUI.

(TBC…)


Experiment types required
=========================

- Extruder

- Standard
- Pump probe

- Fixed target (probably about 80-85% of serial on I24)

- Standard chip collection – option for multiple exposures in each
spot
- Pump probe - see for short description
https://confluence.diamond.ac.uk/display/MXTech/Dynamics+and+fixed+targets

- Short delays
- Excite and visit again
- Long delays with fast shutter opening/closing

- (Future) Fixed target with rotation at each “window” (Preliminary
work done by beamline staff on the PMAC program
https://confluence.diamond.ac.uk/display/MXTech/Grids+with+rotations)

Details of zebra settings for each type:
https://confluence.diamond.ac.uk/display/MXTech/Zebra+settings+I24

Note that most of the set up for the fixed target is actually done by
the PMAC via PMAC strings.



--------------

Old roadmap for reference


+---------------------------------------+----------------+---------------------------------+
| Work Ongoing | Rough Timeline | Completed |
+=======================================+================+=================================+
Expand Down Expand Up @@ -71,34 +119,3 @@ Ongoing list of things needed:
| Tidy up original code and add some | Summer 23 | :material-regular:`check;2em` |
| tests | | |
+---------------------------------------+----------------+---------------------------------+

--------------

Experiment types required
=========================

- Extruder

- Standard
- Pump probe

- Fixed target (probably about 80-85% of serial on I24)

- Standard chip collection – option for multiple exposures in each
spot
- Pump probe - see for short description
https://confluence.diamond.ac.uk/display/MXTech/Dynamics+and+fixed+targets

- Short delays
- Excite and visit again
- Long delays with fs opening/closing

- (Future) Fixed target with rotation at each “window” (Preliminary
work done by beamline staff on the PMAC program
https://confluence.diamond.ac.uk/display/MXTech/Grids+with+rotations)

Details of zebra settings for each type:
https://confluence.diamond.ac.uk/display/MXTech/Zebra+settings+I24

Note that most of the set up for the fixed target is actually done by
the PMAC via PMAC strings.