Skip to content

Room fix (#111)

Room fix (#111) #78

Triggered via push November 13, 2023 11:23
Status Failure
Total duration 59s
Artifacts

unit-tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (18.x)
Process completed with exit code 1.
build (20.x)
The job was canceled because "_18_x" failed.
build (20.x)
The operation was canceled.