more flake fixes #11566
ci.yaml
on: pull_request
Pre-build checks
12m 25s
Check Nix Flake
15m 46s
Matrix: compile
Run fuzz regression tests
9m 18s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
Matrix: min-btc-support
CI completion
0s
Annotations
9 errors
Valgrind Test CLN Valgrind (01/10)
Process completed with exit code 1.
|
Valgrind Test CLN Valgrind (05/10)
The job was canceled because "Valgrind__01_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (05/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (02/10)
The job was canceled because "Valgrind__01_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (08/10)
The job was canceled because "Valgrind__01_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (08/10)
The operation was canceled.
|
Test minimum supported BTC v25.0 with clang
Process completed with exit code 1.
|
Test CLN clang
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
|
193 MB |
|
cln-compile-clang.tar.bz2
|
130 MB |
|
cln-compile-gcc-O3.tar.bz2
|
163 MB |
|
cln-compile-gcc.tar.bz2
|
129 MB |
|