Some first change in a release-cycle from a fork #32
ci.yml
on: pull_request
check-dash-licenses
/
check-licenses
2m 35s
build
/
Upload Event File
3s
Matrix: build / build
Annotations
5 errors and 1 warning
check-dash-licenses / check-licenses
Process completed with exit code 1.
|
build / Verify Windows
The process 'C:\hostedtoolcache\windows\maven\3.9.7\x64\bin\mvn.cmd' failed with exit code 1
|
build / Verify MacOS
The process '/Users/runner/hostedtoolcache/maven/3.9.7/x64/bin/mvn' failed with exit code 1
|
build / Verify Linux
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/3/merge' exists
|
build / Verify Linux
The operation was canceled.
|
build / Verify Linux
No files were found with the provided path: /home/runner/work/eclipse.pde/eclipse.pde/**/target/surefire-reports/*.xml
/home/runner/work/eclipse.pde/eclipse.pde/**/results/**/*.png. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Event File
Expired
|
3.19 KB |
|
test-results-macos-13
Expired
|
1.13 MB |
|
test-results-windows-latest
Expired
|
1.21 MB |
|