Skip to content

Some first change in a release-cycle from this repo #72

Some first change in a release-cycle from this repo

Some first change in a release-cycle from this repo #72

Triggered via pull request September 24, 2024 22:22
@HannesWellHannesWell
synchronize #2
dummy_change
Status Cancelled
Total duration 7m 12s
Artifacts 2

ci.yml

on: pull_request
check-dash-licenses  /  check-licenses
1m 27s
check-dash-licenses / check-licenses
build  /  Upload Event File
2s
build / Upload Event File
Matrix: build / build
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 2 warnings
build / Verify Windows
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/2/merge' exists
build / Verify Windows
The operation was canceled.
build / Verify Linux
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/2/merge' exists
build / Verify Linux
The operation was canceled.
build / Verify MacOS
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/2/merge' exists
build / Verify MacOS
The operation was canceled.
build / Verify Windows
No files were found with the provided path: D:\a\eclipse.pde\eclipse.pde/**/target/surefire-reports/*.xml D:\a\eclipse.pde\eclipse.pde/**/results/**/*.png. No artifacts will be uploaded.
build / Verify MacOS
No files were found with the provided path: /Users/runner/work/eclipse.pde/eclipse.pde/**/target/surefire-reports/*.xml /Users/runner/work/eclipse.pde/eclipse.pde/**/results/**/*.png. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
Event File
2.75 KB
test-results-ubuntu-latest
24.5 KB