Print overhaul #944
run-tests.yaml
on: pull_request
Matrix: merge-test-1
Matrix: merge-test-2
Merge tests 3 (Windows)
1m 23s
Merge tests 4 (Test repo files)
22s
Annotations
6 errors
Merge tests 1 (native_posix_64 with asserts)
Process completed with exit code 1.
|
Merge tests 1 (mps2_an521 with asserts)
The operation was canceled.
|
Merge tests 1 (native_posix)
The operation was canceled.
|
Merge tests 1 (native_posix with asserts)
The operation was canceled.
|
Merge tests 1 (mps2_an521)
The operation was canceled.
|
Merge tests 1 (native_posix_64)
The operation was canceled.
|