Skip to content

gh deployment stuff #10

gh deployment stuff

gh deployment stuff #10

Triggered via push September 17, 2023 02:15
Status Failure
Total duration 25s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.8)
Process completed with exit code 30.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
Process completed with exit code 30.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
The operation was canceled.