Feat/wormhole connect cutover #434
testnet.yml
on: pull_request
build
/
Compute Branch Sha
0s
build
/
Advance Tools
1m 9s
build
/
USDC Bridge
2m 9s
build
/
Token Bridge
2m 9s
Deploy Testnet
0s
Annotations
6 errors
build / USDC Bridge
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-usdc-bridge' exists
|
build / USDC Bridge
The operation was canceled.
|
build / Token Bridge
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-token-bridge' exists
|
build / Token Bridge
The operation was canceled.
|
build / Advance Tools
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-advance-tools' exists
|
build / Advance Tools
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
build-docs
Expired
|
71.1 MB |
|
build-redirects
Expired
|
2.22 KB |
|