Feat/wormhole connect cutover #459
testnet.yml
on: pull_request
Compute Branch Sha
0s
Build Testnet
/
Documentation
1m 43s
Build Testnet
/
Advance Tools
2m 26s
Build Testnet
/
Redirects
14s
Build Testnet
/
USDC Bridge
2m 16s
Build Testnet
/
Token Bridge
2m 15s
Deploy Testnet
0s
Annotations
6 errors
Build Testnet / Token Bridge
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-token-bridge' exists
|
Build Testnet / Token Bridge
The operation was canceled.
|
Build Testnet / USDC Bridge
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-usdc-bridge' exists
|
Build Testnet / Advance Tools
Canceling since a higher priority waiting request for 'refs/pull/490/merge-testnet-advanced-tools' exists
|
Build Testnet / USDC Bridge
The operation was canceled.
|
Build Testnet / Advance Tools
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
build-docs
Expired
|
71.1 MB |
|
build-redirects
Expired
|
2.29 KB |
|