chore(deps): update other major updates (major) #821
continuous-build.yml
on: pull_request
Matrix: lint-test
All required checks passed
0s
Annotations
5 errors
lint-test (20, 9)
Process completed with exit code 2.
|
lint-test (latest, 9)
The job was canceled because "_20_9" failed.
|
lint-test (latest, 9)
Process completed with exit code 2.
|
lint-test (18, 9)
The job was canceled because "_20_9" failed.
|
lint-test (18, 9)
Process completed with exit code 2.
|