Bump sphinx from 7.1.2 to 7.2.5 in /client/python #2294
python-client.yml
on: push
Matrix: python-client-integration-tests
Matrix: python-client-tox
Annotations
3 errors
python-client-tox (1.20, 3.8)
Process completed with exit code 1.
|
python-client-tox (1.20, 3.9)
The operation was canceled.
|
python-client-tox (1.20, 3.10)
The operation was canceled.
|