Skip to content

chore: merge upstream v48 #203

chore: merge upstream v48

chore: merge upstream v48 #203

Triggered via pull request November 7, 2024 01:53
@j75689j75689
synchronize #85
merge-v48
Status Failure
Total duration 7m 8s
Artifacts

ethereum-tests.yml

on: pull_request
Matrix: Ethereum Tests (Stable)
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 2 warnings
Ethereum Tests (Stable) (release, i686-unknown-linux-gnu)
Process completed with exit code 101.
Ethereum Tests (Stable) (ethtests, x86_64-unknown-linux-gnu)
The job was canceled because "release_i686-unknown-linu" failed.
Ethereum Tests (Stable) (ethtests, x86_64-unknown-linux-gnu)
The operation was canceled.
Ethereum Tests (Stable) (ethtests, i686-unknown-linux-gnu)
The job was canceled because "release_i686-unknown-linu" failed.
Ethereum Tests (Stable) (ethtests, i686-unknown-linux-gnu)
The operation was canceled.
Ethereum Tests (Stable) (release, x86_64-unknown-linux-gnu)
The job was canceled because "release_i686-unknown-linu" failed.
Ethereum Tests (Stable) (release, x86_64-unknown-linux-gnu)
The operation was canceled.
Ethereum Tests (Stable) (release, x86_64-unknown-linux-gnu)
Failed to download action 'https://api.github.com/repos/dtolnay/rust-toolchain/tarball/ed2356ad628626a6b3f5be6c3e0255c0454fcdb9'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Ethereum Tests (Stable) (release, x86_64-unknown-linux-gnu)
Back off 24.933 seconds before retry.