Skip to content

feat: required changes for multi engine release #3148

feat: required changes for multi engine release

feat: required changes for multi engine release #3148

Triggered via pull request October 16, 2023 11:10
Status Cancelled
Total duration 2m 22s
Artifacts

ci-development.yml

on: pull_request
Matrix: build / compile
Matrix: pre-check / lint-dev-dockerfiles
Matrix: pre-check / lint-prod-dockerfiles
Matrix: test / test-preinst-scripts
docker  /  get-date-time
docker / get-date-time
docker  /  set-dockerfile-name
docker / set-dockerfile-name
Matrix: package / packages
Waiting for pending jobs
post-check  /  benchmarks
post-check / benchmarks
post-check  /  bouncer
post-check / bouncer
Matrix: docker / private-images
Waiting for pending jobs
Matrix: docker / public-images
Waiting for pending jobs
Matrix: publish / build-deb
Waiting for pending jobs
merge-commit-summary  /  build-deb
merge-commit-summary / build-deb
Fit to window
Zoom out
Zoom in

Annotations

15 errors
test / test-preinst-scripts (engine/package/preinst-tests)
Process completed with exit code 1.
test / test-preinst-scripts (state-chain/node/package/preinst-tests)
The job was canceled because "engine_package_preinst-te" failed.
test / test-preinst-scripts (state-chain/node/package/preinst-tests)
The operation was canceled.
pre-check / audit
Canceling since a higher priority waiting request for 'refs/pull/4123/merge-release-development' exists
pre-check / audit
The operation was canceled.
build / compile (20.04)
Canceling since a higher priority waiting request for 'refs/pull/4123/merge-release-development' exists
pre-check / cargo-clippy
Canceling since a higher priority waiting request for 'refs/pull/4123/merge-release-development' exists
build / compile (20.04)
The operation was canceled.
pre-check / cargo-clippy
The operation was canceled.
test / coverage
Canceling since a higher priority waiting request for 'refs/pull/4123/merge-release-development' exists
test / coverage
The operation was canceled.
build / compile (22.04)
Canceling since a higher priority waiting request for 'refs/pull/4123/merge-release-development' exists
build / compile (22.04)
The operation was canceled.
test / unit-tests
Canceling since a higher priority waiting request for 'refs/pull/4123/merge-release-development' exists
test / unit-tests
The operation was canceled.