Refactor CI to return better results faster #287
Triggered via pull request
November 3, 2023 18:07
Status
Cancelled
Total duration
21m 32s
Artifacts
–
main_ci.yml
on: pull_request
Formatting Check
31s
Matrix: Build and test
Interop test
0s
Matrix: Build with clang-tidy
Annotations
6 errors
Build and test (windows-latest, boringssl)
The run was canceled by @bifurcation.
|
Build and test (windows-latest, boringssl)
The operation was canceled.
|
Build and test (windows-latest, openssl_1.1)
The run was canceled by @bifurcation.
|
Build and test (windows-latest, openssl_1.1)
The operation was canceled.
|
Build and test (windows-latest, openssl_3)
The run was canceled by @bifurcation.
|
Build and test (windows-latest, openssl_3)
The operation was canceled.
|