Skip to content

Prepare changelog for next release #41

Prepare changelog for next release

Prepare changelog for next release #41

Triggered via push December 5, 2023 19:26
Status Failure
Total duration 7m 47s
Artifacts

build.yml

on: push
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Build (windows-latest, 3.9)
Process completed with exit code 2.
Build (macos-latest, 3.8)
The operation was canceled.
Build (windows-latest, 3.10)
The operation was canceled.
Build (macos-latest, 3.10)
The operation was canceled.
Build (macos-latest, 3.9)
The operation was canceled.
Build (windows-latest, 3.8)
The operation was canceled.