Skip to content

Commit

Permalink
Improve: question87 answer missing space
Browse files Browse the repository at this point in the history
  • Loading branch information
danieldanielecki authored May 23, 2023
1 parent 4490ce9 commit 790dd85
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion README.md
Original file line number Diff line number Diff line change
Expand Up @@ -1109,7 +1109,7 @@ We are so thankful for every contribution, which makes sure we can deliver top-n

- [x] The Development Team makes sure that all of the selected scope per Sprint is as "Done" as possible. The undone work is estimated and added to the Sprint
- [ ] Add enough people to the Development Team for the deadline to be made.
- [ ] The opportunity to inspect and adapt is lost. Opaqueness has replaced transparency. Predictability has dropped below zero. The produced software is not usable. As the rules of Scrum have not been respected, it is the Scrum Master'sduty to assess whether repair is possible, or a restart with a more reliable team. If not, the Scrum Master should cancel the project.
- [ ] The opportunity to inspect and adapt is lost. Opaqueness has replaced transparency. Predictability has dropped below zero. The produced software is not usable. As the rules of Scrum have not been respected, it is the Scrum Master's duty to assess whether repair is possible, or a restart with a more reliable team. If not, the Scrum Master should cancel the project.
- [ ] The Development Team should remind Marian to find funding for enough Release Sprints in which the remaining work can be done.