Skip to content

Further refactor of Configuration #816

Further refactor of Configuration

Further refactor of Configuration #816

Triggered via push June 19, 2024 08:16
Status Failure
Total duration 1m 11s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/peer_sdp_test.exs#L7
test chromium SDP offer is functional and maintains tracks (ExWebRTC.PeerSDPTest)
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/peer_sdp_test.exs#L7
test firefox SDP offer is functional and maintains tracks (ExWebRTC.PeerSDPTest)
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/renegotiation_test.exs#L8
test stop two and add one with different kind (ExWebRTC.RenegotiationTest)
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/peer_connection_test.exs#L760
test replace_track/3 correct sender id (ExWebRTC.PeerConnectionTest)
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/peer_connection_test.exs#L53
test negotiation needed is not fired when adding transceiver during negotiation (ExWebRTC.PeerConnectionTest)
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/renegotiation_test.exs#L62
test stop one and add two with switched kinds (ExWebRTC.RenegotiationTest)
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/renegotiation_test.exs#L155
test add and remove tracks in a loop (ExWebRTC.RenegotiationTest)
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/dtls_transport_test.exs#L165
test finishes handshake in active mode (ExWebRTC.DTLSTransportTest)
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/peer_connection_test.exs#L561
test stop_transceiver/2 with renegotiation (ExWebRTC.PeerConnectionTest)
CI on OTP 26 / Elixir 1.16: test/ex_webrtc/peer_connection_test.exs#L550
test stop_transceiver/2 before the first offer (ExWebRTC.PeerConnectionTest)