move upgrade notes to install section #13277
build_and_test.yaml
on: pull_request
lint
5m 16s
gen-check
3m 56s
license-check
9s
coverage-test
5m 6s
publish
0s
Annotations
7 errors
e2e-test (v1.29.4)
Process completed with exit code 2.
|
e2e-test (v1.30.0)
The job was canceled because "v1_29_4" failed.
|
e2e-test (v1.30.0)
The operation was canceled.
|
e2e-test (v1.28.9)
The job was canceled because "v1_29_4" failed.
|
e2e-test (v1.28.9)
The operation was canceled.
|
e2e-test (v1.27.13)
The job was canceled because "v1_29_4" failed.
|
e2e-test (v1.27.13)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
envoy-gateway
Expired
|
188 MB |
|