Skip to content

[e2e] eg release upgrade test #8744

[e2e] eg release upgrade test

[e2e] eg release upgrade test #8744

Re-run triggered March 10, 2024 20:49
Status Failure
Total duration 19m 3s
Artifacts 1

build_and_test.yaml

on: pull_request
Matrix: conformance-test
Matrix: e2e-test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

12 errors
conformance-test (v1.29.2)
Process completed with exit code 2.
conformance-test (v1.28.7)
The job was canceled because "v1_29_2" failed.
conformance-test (v1.28.7)
The operation was canceled.
conformance-test (v1.26.14)
The job was canceled because "v1_29_2" failed.
conformance-test (v1.26.14)
The operation was canceled.
e2e-test (v1.29.2)
Process completed with exit code 2.
e2e-test (v1.27.11)
The job was canceled because "v1_29_2" failed.
e2e-test (v1.27.11)
Process completed with exit code 2.
e2e-test (v1.28.7)
The job was canceled because "v1_29_2" failed.
e2e-test (v1.28.7)
The operation was canceled.
e2e-test (v1.26.14)
The job was canceled because "v1_29_2" failed.
e2e-test (v1.26.14)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
envoy-gateway Expired
133 MB