Skip to content

[e2e] eg release upgrade test #8747

[e2e] eg release upgrade test

[e2e] eg release upgrade test #8747

Re-run triggered March 10, 2024 21:37
Status Failure
Total duration 15m 4s
Artifacts 1

build_and_test.yaml

on: pull_request
Matrix: conformance-test
Matrix: e2e-test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

7 errors
e2e-test (v1.26.14)
Process completed with exit code 2.
e2e-test (v1.29.2)
The job was canceled because "v1_26_14" failed.
e2e-test (v1.29.2)
The operation was canceled.
e2e-test (v1.28.7)
The job was canceled because "v1_26_14" failed.
e2e-test (v1.28.7)
The operation was canceled.
e2e-test (v1.27.11)
The job was canceled because "v1_26_14" failed.
e2e-test (v1.27.11)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
envoy-gateway Expired
133 MB