docs: set up linkinator for doc site #9135
build_and_test.yaml
on: pull_request
lint
3m 36s
gen-check
2m 12s
license-check
7s
coverage-test
3m 3s
Matrix: conformance-test
Matrix: e2e-test
publish
0s
Annotations
8 errors
conformance-test (v1.28.7)
Process completed with exit code 2.
|
e2e-test (v1.29.2)
Process completed with exit code 2.
|
e2e-test (v1.28.7)
The job was canceled because "v1_29_2" failed.
|
e2e-test (v1.28.7)
The operation was canceled.
|
e2e-test (v1.27.11)
The job was canceled because "v1_29_2" failed.
|
e2e-test (v1.27.11)
The operation was canceled.
|
e2e-test (v1.26.14)
The job was canceled because "v1_29_2" failed.
|
e2e-test (v1.26.14)
The operation was canceled.
|