Skip to content

feat(translator): implement connection limit #9306

feat(translator): implement connection limit

feat(translator): implement connection limit #9306

Triggered via pull request March 26, 2024 07:18
Status Failure
Total duration 15m 40s
Artifacts 1

build_and_test.yaml

on: pull_request
Matrix: conformance-test
Matrix: e2e-test
publish
0s
publish
Fit to window
Zoom out
Zoom in

Annotations

10 errors
conformance-test (v1.29.2)
Process completed with exit code 2.
conformance-test (v1.27.11)
The job was canceled because "v1_29_2" failed.
conformance-test (v1.27.11)
The operation was canceled.
e2e-test (v1.27.11)
Process completed with exit code 2.
e2e-test (v1.29.2)
The job was canceled because "v1_27_11" failed.
e2e-test (v1.29.2)
The operation was canceled.
e2e-test (v1.28.7)
The job was canceled because "v1_27_11" failed.
e2e-test (v1.28.7)
The operation was canceled.
e2e-test (v1.26.14)
The job was canceled because "v1_27_11" failed.
e2e-test (v1.26.14)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
envoy-gateway Expired
134 MB