build(deps): bump google.golang.org/protobuf from 1.28.1 to 1.33.0 in /tools/src/protoc-gen-go-grpc #10391
build_and_test.yaml
on: pull_request
lint
3m 50s
gen-check
2m 35s
license-check
7s
coverage-test
3m 48s
Matrix: conformance-test
Matrix: e2e-test
publish
0s
Annotations
8 errors
conformance-test (v1.29.2)
Process completed with exit code 2.
|
e2e-test (v1.26.14)
Process completed with exit code 2.
|
e2e-test (v1.27.11)
The job was canceled because "v1_26_14" failed.
|
e2e-test (v1.27.11)
The operation was canceled.
|
e2e-test (v1.28.7)
The job was canceled because "v1_26_14" failed.
|
e2e-test (v1.28.7)
The operation was canceled.
|
e2e-test (v1.29.2)
The job was canceled because "v1_26_14" failed.
|
e2e-test (v1.29.2)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
envoy-gateway
Expired
|
148 MB |
|