composer(deps): Bump symfony/process from 6.4.8 to 6.4.14 #1906
integrate.yaml
on: pull_request
Matrix: Backward-Compatibility Analysis
Matrix: Code Coverage
Matrix: Coding Standards
Matrix: Dependency Analysis
Matrix: Refactoring
Matrix: Security Analysis
Matrix: Static Code Analysis
Matrix: Tests
Annotations
1 error and 5 warnings
Tests (8.2, highest)
The job running on runner GitHub Actions 39 has exceeded the maximum execution time of 5 minutes.
|
Code Coverage (8.1, locked)
Codecov: Failed to properly create commit: The process '/home/runner/work/_actions/codecov/codecov-action/v4.6.0/dist/codecov' failed with exit code 1
|
Tests (8.2, highest)
Failed to download action 'https://api.github.com/repos/shivammathur/setup-php/tarball/c541c155eee45413f5b09a52248675b1a2575231'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Tests (8.2, highest)
Back off 27.764 seconds before retry.
|
Tests (8.2, highest)
Failed to download action 'https://api.github.com/repos/shivammathur/setup-php/tarball/c541c155eee45413f5b09a52248675b1a2575231'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Tests (8.2, highest)
Back off 20.577 seconds before retry.
|