Skip to content

Merge pull request #3 from georgep1ckers/gh-actions #1

Merge pull request #3 from georgep1ckers/gh-actions

Merge pull request #3 from georgep1ckers/gh-actions #1

Triggered via push October 27, 2023 15:50
Status Failure
Total duration 40s
Artifacts
Matrix: build-and-push
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build-and-push (stock-controller)
buildx failed with: ERROR: denied: installation not allowed to Create organization package
build-and-push (warehouse-interface)
The job was canceled because "stock-controller" failed.
build-and-push (warehouse-interface)
The operation was canceled.
build-and-push (order-processor)
The job was canceled because "stock-controller" failed.
build-and-push (order-processor)
The operation was canceled.