Skip dev-igc run if the PR has ci-no-devigc label #2337
sycl-post-commit.yml
on: push
Linux (Self build + no-assertions)
/
Build + LIT
2m 48s
build-win
/
Build + LIT
0s
macOS
/
Build
2m 38s
Matrix: e2e-lin
Waiting for pending jobs
e2e-win
/
run
Annotations
5 errors
build-win / Build + LIT
The run was canceled by @uditagarwal97.
|
macOS / Build
The run was canceled by @uditagarwal97.
|
macOS / Build
The operation was canceled.
|
Linux (Self build + no-assertions) / Build + LIT
The run was canceled by @uditagarwal97.
|
Linux (Self build + no-assertions) / Build + LIT
The operation was canceled.
|