Skip to content

feat(levm): fix validation errors (part 2) and some extra things #56

feat(levm): fix validation errors (part 2) and some extra things

feat(levm): fix validation errors (part 2) and some extra things #56

Triggered via pull request November 28, 2024 21:34
Status Cancelled
Total duration 1m 10s
Artifacts

ci_l1.yaml

on: pull_request
Matrix: run-hive
Assertoor - Stability Check
0s
Assertoor - Stability Check
Integration Test
0s
Integration Test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Build Docker
Canceling since a higher priority waiting request for 'L1-levm/transact-refactor' exists
Build Docker
The operation was canceled.
Lint
Canceling since a higher priority waiting request for 'L1-levm/transact-refactor' exists
Lint
The operation was canceled.
Integration Test
Process completed with exit code 1.
Test
Canceling since a higher priority waiting request for 'L1-levm/transact-refactor' exists
Test
The operation was canceled.