Try operation of linux-6.1.y in Ski with extra patch #298
mirror.yml
on: push
mirror_and_check
13m 17s
Matrix: matrix_build
Annotations
14 errors
matrix_build (linux-5.15.y)
The run was canceled by @johnny-mnemonic.
|
matrix_build (linux-5.15.y)
The operation was canceled.
|
matrix_build (linux-4.19.y)
The run was canceled by @johnny-mnemonic.
|
matrix_build (linux-4.19.y)
The operation was canceled.
|
matrix_build (linux-6.10.y)
The run was canceled by @johnny-mnemonic.
|
matrix_build (linux-6.10.y)
The operation was canceled.
|
matrix_build (linux-5.4.y)
The run was canceled by @johnny-mnemonic.
|
matrix_build (linux-5.4.y)
The operation was canceled.
|
matrix_build (linux-5.10.y)
The run was canceled by @johnny-mnemonic.
|
matrix_build (linux-5.10.y)
The operation was canceled.
|
matrix_build (linux-6.6.y)
The run was canceled by @johnny-mnemonic.
|
matrix_build (linux-6.6.y)
The operation was canceled.
|
matrix_build (linux-6.9.y)
The run was canceled by @johnny-mnemonic.
|
matrix_build (linux-6.9.y)
The operation was canceled.
|