chore: update dependency @graphql-tools/utils to ^10.5.4 #15790
Triggered via pull request
September 24, 2024 14:05
Status
Failure
Total duration
1h 31m 28s
Artifacts
–
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
6m 4s
Code Lint
7m 8s
Commit Lint
5m 54s
Verify Docs
6m 10s
Post-Test
0s
Annotations
4 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|
Test (ubuntu-latest, 18)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 20 minutes.
|
Test (ubuntu-latest, 18)
The operation was canceled.
|