Skip to content

Introducing Task Run Locking for Enhanced Concurrency Control in Gokart #543

Introducing Task Run Locking for Enhanced Concurrency Control in Gokart

Introducing Task Run Locking for Enhanced Concurrency Control in Gokart #543

Triggered via pull request February 26, 2024 02:12
Status Failure
Total duration 1m 16s
Artifacts

test.yml

on: pull_request
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
tests (ubuntu-latest, 3.11)
Process completed with exit code 1.
tests (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_11" failed.
tests (ubuntu-latest, 3.10)
Process completed with exit code 1.
tests (ubuntu-latest, 3.9)
The job was canceled because "ubuntu-latest_3_11" failed.
tests (ubuntu-latest, 3.9)
The operation was canceled.
tests (ubuntu-latest, 3.12)
The job was canceled because "ubuntu-latest_3_11" failed.
tests (ubuntu-latest, 3.12)
The operation was canceled.