Skip to content

Commit

Permalink
Merge pull request #1125 from MakerJanSky/12-1-1-Edits
Browse files Browse the repository at this point in the history
12.1.1 Edit
  • Loading branch information
0xldr authored Aug 18, 2024
2 parents 74c9040 + 3092440 commit bde7b5d
Showing 1 changed file with 5 additions and 1 deletion.
6 changes: 5 additions & 1 deletion MIP108/MIP108.md
Original file line number Diff line number Diff line change
Expand Up @@ -229,7 +229,7 @@ The new brand must be developed alongside a new website and domain. The website

##### 2.1.2.3

The new brand must be launched alongside the launch of the NewStable and NewGovToken. They will be renamed according to the new brand.
NewStable, NewGovToken and SavingsNewStable must be launched after the rebrand.

###### 2.1.2.3.1

Expand Down Expand Up @@ -267,6 +267,10 @@ N/A

¤¤¤

#### 3.1.2 Early Bird Launch Program

As a part of the brand reveal phase, the Accessibility Facilitator must ensure that a system for an early bird reward is built. The system should reward all users that sign up before launch date of NewStable and NewGovToken with double the NewGovToken rewards for the first month following launch.

### 3.2: Accessibility Reward Parameters

#### 3.2.1
Expand Down

0 comments on commit bde7b5d

Please sign in to comment.