Skip to content

adjust query

adjust query #25

Triggered via push October 19, 2024 14:30
Status Failure
Total duration 1m 48s
Artifacts

test.yml

on: push
Matrix: cross
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

19 errors
test (1.79.0, ubuntu-latest)
Process completed with exit code 101.
test (stable, macos-latest)
The job was canceled because "_1_79_0_ubuntu-latest" failed.
test (stable, macos-latest)
The operation was canceled.
test (stable, ubuntu-latest)
The job was canceled because "_1_79_0_ubuntu-latest" failed.
test (stable, ubuntu-latest)
The operation was canceled.
test (1.79.0, windows-latest)
The job was canceled because "_1_79_0_ubuntu-latest" failed.
test (1.79.0, windows-latest)
The operation was canceled.
test (1.79.0, macos-latest)
The job was canceled because "_1_79_0_ubuntu-latest" failed.
test (1.79.0, macos-latest)
The operation was canceled.
test (stable, windows-latest)
The job was canceled because "_1_79_0_ubuntu-latest" failed.
cross (aarch64-unknown-linux-gnu)
Process completed with exit code 101.
cross (i686-unknown-linux-gnu)
The job was canceled because "aarch64-unknown-linux-gnu" failed.
cross (i686-unknown-linux-gnu)
Process completed with exit code 101.
cross (riscv64gc-unknown-linux-gnu)
The job was canceled because "aarch64-unknown-linux-gnu" failed.
cross (riscv64gc-unknown-linux-gnu)
Process completed with exit code 101.
cross (aarch64-unknown-linux-musl)
The job was canceled because "aarch64-unknown-linux-gnu" failed.
cross (aarch64-unknown-linux-musl)
The operation was canceled.
cross (powerpc64-unknown-linux-gnu)
The job was canceled because "aarch64-unknown-linux-gnu" failed.
cross (powerpc64-unknown-linux-gnu)
The operation was canceled.