chore(deps-dev): update phpstan/phpstan requirement from ^0.12.90 || ^1.0.0 to ^0.12.90 || ^1.0.0 || ^2.0.0 #1963
pr-validation.yml
on: pull_request
Matrix: validate-pull-request
check-php-version-matrix
0s
Annotations
8 errors
validate-pull-request (8.2)
Process completed with exit code 1.
|
validate-pull-request (8.0)
The job was canceled because "_8_2" failed.
|
validate-pull-request (8.0)
The operation was canceled.
|
validate-pull-request (8.1)
The job was canceled because "_8_2" failed.
|
validate-pull-request (8.1)
The operation was canceled.
|
validate-pull-request (7.4)
The job was canceled because "_8_2" failed.
|
validate-pull-request (7.4)
The operation was canceled.
|
check-php-version-matrix
Process completed with exit code 1.
|