Skip to content

Merge pull request #2106 from winstonzhang-intel/URLZA-391 #9267

Merge pull request #2106 from winstonzhang-intel/URLZA-391

Merge pull request #2106 from winstonzhang-intel/URLZA-391 #9267

Triggered via push September 20, 2024 09:05
Status Failure
Total duration 6h 49m 28s
Artifacts

cmake.yml

on: push
Matrix: Build - Ubuntu
Matrix: CUDA / Build & Test HW
Matrix: Level Zero / Build & Test HW
Matrix: OpenCL / Build & Test HW
Matrix: Fuzz tests short / Build and run fuzz tests on L0 HW
Matrix: HIP / Build & Test HW
Matrix: Level Zero static / Build & Test HW
Matrix: Build - MacOS
Matrix: Native CPU / Build & Test HW
Matrix: Build - Windows
E2E CUDA  /  ...  /  Check for changed files
10s
E2E CUDA / Start e2e job / Check for changed files
E2E L0  /  ...  /  Check for changed files
10s
E2E L0 / Start e2e job / Check for changed files
E2E OpenCL  /  ...  /  Check for changed files
10s
E2E OpenCL / Start e2e job / Check for changed files
Matrix: E2E CUDA / Start e2e job / Build SYCL, UR, run E2E
Matrix: E2E L0 / Start e2e job / Build SYCL, UR, run E2E
Matrix: E2E OpenCL / Start e2e job / Build SYCL, UR, run E2E
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 1 warning
HIP / Build & Test HW (HIP, OFF, Debug, gcc, g++)
Process completed with exit code 1.
HIP / Build & Test HW (HIP, OFF, Debug, clang, clang++)
The job was canceled because "HIP_OFF_Debug_gcc_g__" failed.
HIP / Build & Test HW (HIP, OFF, Debug, clang, clang++)
Process completed with exit code 1.
HIP / Build & Test HW (HIP, OFF, Release, gcc, g++)
The job was canceled because "HIP_OFF_Debug_gcc_g__" failed.
HIP / Build & Test HW (HIP, OFF, Release, gcc, g++)
The operation was canceled.
HIP / Build & Test HW (HIP, OFF, Release, clang, clang++)
The job was canceled because "HIP_OFF_Debug_gcc_g__" failed.
HIP / Build & Test HW (HIP, OFF, Release, clang, clang++)
The operation was canceled.
Level Zero static / Build & Test HW (L0, ON, Debug, gcc, g++)
Process completed with exit code 1.
E2E L0 / Start e2e job / Build SYCL, UR, run E2E (L0, level_zero, ext_oneapi_, gpu, --param gpu-intel-pvc=True --param gpu...
The job running on runner dnp_intel_05_02 has exceeded the maximum execution time of 360 minutes.
E2E L0 / Start e2e job / Build SYCL, UR, run E2E (L0, level_zero, ext_oneapi_, gpu, --param gpu-intel-pvc=True --param gpu...
RPC failed; curl 92 HTTP/2 stream 0 was not closed cleanly: CANCEL (err 8)
Build - MacOS (macos-12)
You are using macOS 12. We (and Apple) do not provide support for this old version. It is expected behaviour that some formulae will fail to build in this old version. It is expected behaviour that Homebrew will be buggy and slow. Do not create any issues about this on Homebrew's GitHub repositories. Do not create any issues even if you think this message is unrelated. Any opened issues will be immediately closed without response. Do not ask for help from Homebrew or its maintainers on social media. You may ask for help in Homebrew's discussions but are unlikely to receive a response. Try to figure out the problem yourself and submit a fix as a pull request. We will review it but may or may not accept it.